PJM transmission operations quiz Questions with Correct Answers 100% Verified
PJM transmission operations quiz Questions with Correct Answers 100% Verified What is the submission requirement for a planned transmission outage of 20 calendar days that is scheduled to start on October 10 and be considered on time A. September 30 B. April 1 C. October 1 D. September 1 - Correct Answer B. April 1 Since PJM operates to a 5% voltage drop limit on the 500 KV system which of the following would be considered a violation A. Pre-536KV, post - 507KV B. Pre-545 kV, post - 520 KV C. Pre-535KV, post - 512 KV D. Pre-530 KV, post - 515 KV - Correct Answer A. Pre-536KV, post-507KV If a transmission line is loaded above it's surge impedance loading what impact would it have on system voltage A. Lower the voltage B. Increase the voltage limits C. Lower the voltage limits D. Increase the voltage - Correct Answer A. Lower the voltage If your system is equipped with 500 KV capacitors that have automatic switching capability and the capacitor is in service, what would be the expected operation of the capacitor if the voltage were between 545KV and 550 KV for 1 to 15 minutes A. The capacitor would be connected to the system B. The capacitor would be disconnected from the system C. There are no 500 KV automatically controlled capacitors
Escuela, estudio y materia
- Institución
- PJM transmission
- Grado
- PJM transmission
Información del documento
- Subido en
- 11 de enero de 2024
- Número de páginas
- 22
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
your outage scheduling
-
what is the submission requirement for a
-
since pjm operates to a 5 voltage drop limit on
-
if a transmission line is loaded above its surge
-
if your system is equipped with 500 kv