100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

WGU C790 Final EXAM QUESTIONS With Correct ANSWERS LATEST UPDATE 2024 (GRADED A+)

Puntuación
-
Vendido
1
Páginas
8
Grado
A+
Subido en
08-01-2024
Escrito en
2023/2024

WGU C790 Final EXAM QUESTIONS With Correct ANSWERS LATEST UPDATE 2024 (GRADED A+) What describes the maintenance phase of the system development life cycle? - Answer The system is upgraded Describe what phase of the system life cycle is the scope of the proposed project identified. - Answer Planning What is the next step in the system life cycle after a new health information system has been purchased? - Answer Test the system In which ways can the use of clinical decision support systems affect health information technology and create a culture of safety within healthcare. - Answer It improves quality of care It improves patient satisfaction What is a major reason to install a clinical decision support system within healthcare information technology - Answer It reduces errors How does a clinical decision support system that uses ANSI and WEDI support a culture of safety - Answer By standardizing healthcare information ANSI: American National Standard Institute WEDI: Workgroup for Electronic Data Interchange Why do healthcare facilities favor purchased information systems over organizationdeveloped information systems? - Answer System enhancements are provided What step in the project implementation of the electronic health record relies heavily upon the ability of the super users? - Answer Manage go-live activities and post golive support Which stage of the planning phase provides the high-level direction needed to reach organizational goals? - Answer Strategic Planning What initiates the life cycle of an information system - Answer Identification of a vision or need Place the implementation steps of the electronic health record life cycle in order from first to last - Answer 1. Identify the problem/ need, obtain approval and proceed with the project 2. Discover and understand the details or the need of the project 3.Build, test and integrate system components 4.Complete system test and then deploy the solution As a crucial part of the whole information technology (IT) infrastructure (hardware, software, networks, operations, etc.) of the organization, this step in the project implementation must be aligned with the organization's mission and support the overall business goals. Which part of the project implementation plan would this be? - Answer Strategic planning What is the correct order of the phases of an adaptive system development life cycle with six core processes and multiple iterations? - Answer 1. Identify the problem and obtain approval 2. Plan and monitor project 3. Discover and understand details 4. Design system components 5. Build, test, and integrate system components 6. Complete system tests and deploy the solution Which system development life cycle approach does the waterfall model describe? - Answer A Sequential approach During which phase of the system development life cycle (SDLC) are new components and programs obtained and installed? - Answer Develop or purchase As the implementation phase of the system development life cycle (SDLC) is occuring, a member of the project management team wants to confirm that all bar code printers have been updates to work with the new system. What testing should be used? - Answer Hardwire testing The nursing team has been charged with selecting a new information system for managing patient census data. Which system should be chosen? - Answer Open system An institution is using the (SDLC) adaptive approach for developing its new information system. The institution will need to be flexible throughout development. Which SDLC approach should be used? - Answer Agile Development A physician's office wants to adopt an electronic medical record. The providers and staff are unsure which system will best suit the needs of the office. Which system development life cycle approach suits this practice? - Answer Adaptive A complex healthcare system is implementing a new electronic health record system with multiple sites. The sites include both inpatient and outpatient clinics. Which SDLC is appropriate for this institution? - Answer Layered Which interdisciplinary team role will a chief information officer undertake when implementing a health information system? - Answer Chair of the information steering committee Who focuses on the enterprise, surrounding environment, resources, quality issues, and business processes to support direct patient care delivery? - Answer Administrator Which groups are responsible for standards development during the implementation of a health information system? - Answer Physicians Pharmacist Registered Nurses A project manager working with the surgery department at a local hospital wants to increase revenue by 20% within three years capturing lost charges. The current supply charge process is evaluated and found to be dysfunctional. An automated dispensing system is identifies as a possible solution. It is projected this system will pay for itself in six months. Which step in the tactical planning process is taking place? - Answer Feasibility Study An electronic medical record project has been implemented. The executive team has approved the system and signed for payment to the vendor. The information technology manager has verified that items on the issues list have been resolved. In which phase is the project management team working? - Answer Closing the project An electronic health record project quality team is preparing to present a benefit-cost analysis comparing two systems for the project manager. Which phase of project management is described? - Answer Planning What is the name of the group of people who work together to coordinate the implementation of electronic health record (EHR) project? - Answer Steering Committee The information technology department of the local hospital has implemented the Academic Center for Evidence-Based Practice (ACE) Star Model of Knowledge Transformation to assist nursing staff to care for patients with methicillin-resistant Staphylococcus aureus more effectively.

Mostrar más Leer menos
Institución
Grado









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
8 de enero de 2024
Número de páginas
8
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$13.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
STUDYROOM2024 Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
397
Miembro desde
2 año
Número de seguidores
212
Documentos
3949
Última venta
6 días hace

For all Nursing Test Banks visit my page. All Papers are Verified and Graded to Score A++ Wish you Success.

3.5

59 reseñas

5
19
4
14
3
13
2
4
1
9

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes