SCMN test 3 Exam Review With complete solution 2023/2024 Questions and Answers When capacity does not match the plan, which of the following actions can be taken? I. Provide sufficient capacity II. Change the material plan III. Modify capacity calculations - Correct Answer:I and II which of the following is an objective of capacity planning? I. building excess capacity for possible future use II. estimating capacity requirements early enough to take action if necessary III. Execution of the plan to avoid suprises - Correct Answer:I and III which capacity planning activities are considered long-range planning a. resource planning and rough-cut capacity planning b. capacity requirements planning c. finite scheduling d. input/output analysis - Correct Answer:a. resource planning and rough-cut capacity planning which capacity planning activities are considered short-range planning a. resource planning b. rough cut capacity planning c. capacity requirements planning d. finite scheduling and input/output analysis - Correct Answer:d. finite scheduling and input/output analysis resource planning is the most closely linked to which manufacturing planning and control (MPC) element - Correct Answer:SOP

Mostrar más Leer menos
Institución
Grado









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Grado

Información del documento

Subido en
8 de enero de 2024
Número de páginas
5
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

SCMN test 3 Exam Review With complete solution 2023/2024
Questions and Answers
When capacity does not match the plan, which of the following actions can be taken?
I. Provide sufficient capacity
II. Change the material plan
III. Modify capacity calculations - Correct Answer:I and II

which of the following is an objective of capacity planning?
I. building excess capacity for possible future use
II. estimating capacity requirements early enough to take action if necessary
III. Execution of the plan to avoid suprises - Correct Answer:I and III

which capacity planning activities are considered long-range planning
a. resource planning and rough-cut capacity planning
b. capacity requirements planning
c. finite scheduling
d. input/output analysis - Correct Answer:a. resource planning and rough-cut capacity planning

which capacity planning activities are considered short-range planning
a. resource planning
b. rough cut capacity planning
c. capacity requirements planning
d. finite scheduling and input/output analysis - Correct Answer:d. finite scheduling and
input/output analysis

resource planning is the most closely linked to which manufacturing planning and control (MPC)
element - Correct Answer:SOP

capacity requirements planning (CRP) is most closely linked to which manufacturing planning
and control MPC element - Correct Answer:detail marketing planning

which capacity planning technique is based on accounting and/or historical data?
a. capacity planning using overall factors
b. capacity bills
c. resource profiles
d. capacity requirements planning - Correct Answer:a. capacity planning using overall factors

the capacity planning using overall factors (CPOF) planning method is likely to function poorly
in a just-in-time (JIT) environment - Correct Answer:false

T/F
The capacity bill planning technique provides more direct linkages to end products than does the
capacity planning using overall factors (CPOF) planning method. - Correct Answer:true

, Under what conditions are both capacity planning using overall factors (CPOF) and capacity
bills likely to return the same capacity requirement results?
a. when planning for a single product
b. when planning for a single work center
c. when planning for a single product that is produced in a single work center
d. the two methods will never return the same result - Correct Answer:When planning for a
single product that is produced in a single work center.

Resource profile planning differs from capacity planning using overall factors (CPOF) and
capacity bills by considering what?
a. custom orders
b. projected workload in individual work centers
c. future capacity expansions
d. inventory plans - Correct Answer:Projected workload in individual work centers

in which of the following ways does capacity planning (CRP) differ from rough-cut capacity
planning techniques
I. CRP uses a time-phased approach
II. CRP considers service part demand
III. CRP considers standard lot sizes - Correct Answer:I and II

T/F
Capacity requirements planning (CRP) ignores current finished goods and work-in-process
inventory levels. - Correct Answer:false

Which of these planning techniques requires the most computing resources?
A.Resource profiles
B.Capacity requirements using overall factors (CPOF)
C.Capacity requirements planning (CRP)
D.Capacity bills - Correct Answer:C.Capacity requirements planning (CRP)

Which of the following are benefits of simultaneous planning of capacity and materials?
I. Fewer compute resources required
II. Better utilization of existing capacity
III. Eliminates the need to expand capacity - Correct Answer:II

T/F
Finite scheduling techniques always assign jobs to available capacity on a first-come, first-served
basis. - Correct Answer:False

T/F
The horizontal loading scheduling approach is more likely to result in higher capacity utilization.
- Correct Answer:False

T/F
$10.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
kennethkaroki

Conoce al vendedor

Seller avatar
kennethkaroki Kent State University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
0
Miembro desde
1 año
Número de seguidores
0
Documentos
36
Última venta
-
Elite Hub

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes