PSPO I CERTIFICATION SCRUM | 175 Questions with 100% Correct Answers | Verified | Latest Update 2024
The Product Backlog is ordered by : - Importance, where the most important items are at the top of all items. The term « pigs » is used to refer to which of the following roles in a Scrum project? - The team Which two are properties of the Daily Scrum? - It is fifteen minutes or less in duration. Its location and time should remain constant A key measure of success for the Product Owner to track is the development team's velocity. - FALSE Select the two focus areas that are not considered in executing Value Driven Development by the Product Owner. - Coach of the Development Team in self-organization and cross-functionality Remover of impediments to the Development Team's progress What is the Sprint Backlog? - The Product Backlog items selected for this Sprint plus the plan for delivering them Product Backlog Items should always be expressed as User Stories. - FALSE Everyone must stand up at the Daily Scrum. - FALSE
Escuela, estudio y materia
- Institución
- PSPO I CERTIFICATION SCRUM
- Grado
- PSPO I CERTIFICATION SCRUM
Información del documento
- Subido en
- 5 de enero de 2024
- Número de páginas
- 20
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
pspo i certification scrum 175 questions with 10
Documento también disponible en un lote