CSLB B LICENSE GENERAL CONTRACTOR EXAM 2024
CSLB B LICENSE GENERAL CONTRACTOR EXAM 2024 If unused mortar stiffens due to hydration of cement, what must you do? - ANS ️️ Discard the mortar What minimum time must you wait before caulking or grouting new tiles? - ANS ️️ 24-48 Hours How long should you wait before installing tile on a shower pan? - ANS ️️ 24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - ANS ️️ Type-B Soils If 65 street lights are fed by a 2275 volt series circuit, what is the voltage across each light? - ANS ️️ 35V In a series circuit, the total voltage is divided equally. For safety reasons, the maximum simple slope of an excavation, up to 20 ft deep, in Type-B soil is: - ANS ️️ 1:1 (45°) A Pittsburgh joint is used in: - ANS ️️ HVAC ductwork The drain for a pressure relief valve on a water heater should be extended to: - ANS ️️ The outside of the building
Escuela, estudio y materia
- Institución
- NY Home Improvement
- Grado
- NY Home Improvement
Información del documento
- Subido en
- 17 de diciembre de 2023
- Número de páginas
- 53
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
cslb b license general contractor exam 2024
Documento también disponible en un lote