Plumbing LVL 2 Final Exam Review (3) Questions and Answers
Plumbing LVL 2 Final Exam Review (3) Questions and Answers A _________ water closet is a water closet with a non-siphonic passageway at the rear of the bowl and integral flush rim and priming jets - ANSWER ️️ Blowout A ______________ urinal is a wall hung urinal with a non-siphonic passageway at the rear of the bowl an integral flush rim and jet. - ANSWER ️️ Blowout A single fixture outlet shall not exceed ____________ developed length. - ANSWER ️️ 1200 mm An offset in the wet vent shall not exceed _________ metres for pipelarger than 2 inch - ANSWER ️️ 2.5 metres ___________ shall not be used for the fixture drain or the portion of the wet vent below the floodlevel rim of manually flushing or waterless urinals. - ANSWER ️️ Copper tube When converting fixture units to litres if the number of fixture units is 260 or less the load is ____________ litres. - ANSWER ️️ 2360 litres A 4" soil or waste stack passes through 22 stories. Of the 22 stories only 13 of the 22 stories receives a discharge from fixtures. What must be done? (This is not a wet vented stack) - ANSWER ️️ A vent stack, stack vent in yoke vents need to be connected with the major vents taken to outside air
Escuela, estudio y materia
- Institución
- Plumbing
- Grado
- Plumbing
Información del documento
- Subido en
- 17 de diciembre de 2023
- Número de páginas
- 2
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
plumbing lvl 2 final exam review 3
Documento también disponible en un lote