100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

NEIEP 200 FINAL EXAM V1 NEW 2023/2024 EDITION

Puntuación
-
Vendido
-
Páginas
8
Grado
A+
Subido en
13-12-2023
Escrito en
2023/2024

NEIEP 200 FINAL EXAM V1 NEW 2023/2024 EDITION you are preparing the assemble the car sling on a hydro. what are the components - ANSWERS-crosshead, stiles, bolster channel you are preparing to hoist rails and are inspecting your manila rope. which of the following is a good characteristic of manila rope? - ANSWERS-a light yellow color with a silvery or pearly luster you are preparing to install comp chains and notice there are two sets of hitch points. which ones should you initially use? - ANSWERS-two nearest the counterweight you are preparing to install machine beams for a geared traction machine and have established the centerline of the car and counter weight rails. what does this centerline represent - ANSWERS-drive sheave centerline you are preparing to install the compensating ropes. where should the reels and jacks be set up - ANSWERS-lowest access point you are preparing to lift a load and need to tie the ends of two ropes together. which knot should you use? - ANSWERS-square you are preparing to unload a truck at the loading dock and the truck is 8" higher than the dock. what do you do? - ANSWERS-use a steel plate to span the gap you are preparing to use a chainfall to lift a load up a hoistway. what safety equipment is required on each of the two hooks on the chain fall? - ANSWERS-tags you are ready to cut the dead end excess after reshackling. how far past the socket should you cut it - ANSWERS-6-9" you are reroping and elevator and have selected two chainfalls to hang the car. the total weight of the car is 4000. what should be the minimum capacity of each chain fall - ANSWERS-4000 lbs you are rigging elevator equipment with a sling angle of 60 degrees. you are using a shouldered eye bolt with a tapped 1/2" diameter hole. once the shoulder is seated, what is the minimum thread depth required? - ANSWERS-at least 3/4" you are selecting a wire rope sling to rig 1000lbs. what safety factor does asme require? - ANSWERS-5:1 you are setting up welding equipment. what is the maximum psi that the regulator for the acetylene gas may be adjusted to? - ANSWERS-10-12 psi you are storing fiber core wire rope slings. what could cause damage to the core material? - ANSWERS-solvents you are tasked with setting 3/4" concrete anchors. which type of drill should you use? - ANSWERS-rotary hammer you are tensioning the ropes on an elevator that has two different length of shackles. how must you tension the ropes - ANSWERS-shackles must be equally tensioned you are using a bowline knot- what is one disadvantage of this knot - ANSWERS-is can easily loosen when not loaded you are using a plumb line to check a rail for plumb. you find that at the top it measures 1" and at the bottom it measures 1 1/4". what does this tell you? - ANSWERS-a. the top of the rail needs to go towards the center b. the top of the rail needs to go toward the wall c. the bottom of the rail needs to go toward the wall you are using rollers to move a heavy elevator machine and are approaching a corner. which technique should you use to maneuver around it? - ANSWERS-angle front roller gradually and continue around the corner you are working in a pit 72" deep. what does asme require regarding stop switches? - ANSWERS-a second stop switch must be installed 47" above the pit floor you are working in a pit deeper than normal. what can you do to bring the buffers up to the proper height? - ANSWERS-buffer stands you are working on an elevator machine and you notice the drive sheave and brake drum are directly mounted on the motor shaft. what machine are you working on? - ANSWERS-gearless you arrive at a job and notice the counterweight has a governor. what does this mean - ANSWERS-there's an occupied space below you have constructed a wooden template for position a basement geared traction machine to its foundation. what two machine centerline reference points must be marked on the template to properly orient the foundation bolt holes - ANSWERS-worm shaft, sheave shaft

Mostrar más Leer menos
Institución
NEIEP 200
Grado
NEIEP 200









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
NEIEP 200
Grado
NEIEP 200

Información del documento

Subido en
13 de diciembre de 2023
Número de páginas
8
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$24.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
kelvinmwanjiru

Conoce al vendedor

Seller avatar
kelvinmwanjiru Chamberlain School Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
0
Miembro desde
2 año
Número de seguidores
0
Documentos
124
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes