27105 Floor Systems Module 5 Questions And Answers Verified 100% Correct!!
Crown - The highest point of the curved edge of a framing member Dead Load - The weight of permanent, stationary construction and equipment included in a building Dome pan - Metal or fiberglass concrete form used for two-way joist system End Joist - The first and last joists in a floor system; they run parallel to the common joist Fire Stop - An approved material used to fill air passages in a frame to retard the spread of fire Floor Truss - An engineered assembly that is used to support floors Foundation - The supporting portion of a structure, including the footings Header - Used to frame floor openings/they run perpendicular to the direction of the joists and are typically doubled Header Joist - A framing member used in platform framing into which the common joists are fitted. Header joists are also used to support the free ends of joists when framing openings in a floor Joist Hanger - A metal stirrup secured to the face of a structural member, such as a girder, to support and align the ends of joists flush with the member Lateral Pressure - Sideways pressure against a structure, such as a foundationLet-in - Any type of notch in a stud or joist, which holds another piece. The item that is supported by the notch is said to be let in Live Load - The total of all moving and variable loads that may be places upon a structure Long Pan - Metal or fiberglass concrete form used for one-way joist systems
Escuela, estudio y materia
- Institución
- 27105 Floor Systems Module 5
- Grado
- 27105 Floor Systems Module 5
Información del documento
- Subido en
- 16 de noviembre de 2023
- Número de páginas
- 3
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
27105 floor systems module 5
Documento también disponible en un lote