WGU C724 Unit 6 Test Questions and Answers with complete solution
The six formal steps that need to be followed to develop an information system is known as what? - system development life cycle What are the four categories of an organizational change? - automation, rationalization, process redesign, and paradigm What method uses 4th generation computer languages? - end user development What are the stages in the waterfall model? - system design, programming, testing, conversion, and production and maintenance What is a component of a feasibility study? - technical and economic ABC playground company has been asked to build new playground at a local elementary school. The project must be completed before the first day of school. What steps would increase the likelihood of finishing the project on time? - have the most experienced workers complete tasks on the critical path What is UML - a general purpose modeling language (unified modeling language) What is a key factor to consider when evaluating system alternative? - economic, compatibility, limitations What are the factors that must be considered when implementing anew information system? - resistance to change, user, technical ability What is the difference between ICR and OCR? - ICR (intelligent character recognition) is an intelligent or advanced form of OCR. (optical character recognitionWhat are software patches? - fix bugs, are expensive and time consuming What is the purpose of a general MIS evaluation? - A company's general evaluation of their MIS is to analyze the system performance against outlined objectives.
Escuela, estudio y materia
- Institución
- WGU C724 Unit 6
- Grado
- WGU C724 Unit 6
Información del documento
- Subido en
- 4 de noviembre de 2023
- Número de páginas
- 9
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
wgu c724 unit 6
Documento también disponible en un lote