DOD 5105.21 VOL 2 ENC 2 PHYSICAL SECURITY (Answered) 100%
SCIF security begins with ___ Decision to build a SCIF Adequate planning/design will prevent what 2 things? 1. Many security risks to SCI and 2. Reduce the costs of construction. Site planning should include look at standoff distances for what? AT/FP (Anti-terrorism/Force Protection) Site planning should include TEMPEST What is the first critical element in the establishment of a SCIF? Concept approval Once a need for SCI has been identified, the CO will submit a request. What does the request identi
Escuela, estudio y materia
- Institución
- DOD 5105.21 VOL 2 ENC 2 PHYSICAL SECURITY (Answere
- Grado
- DOD 5105.21 VOL 2 ENC 2 PHYSICAL SECURITY (Answere
Información del documento
- Subido en
- 30 de octubre de 2023
- Número de páginas
- 5
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
scif security begins with decision to build a