Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 4 fuera de 43 páginas
Examen

ARE 5.0 Construction & Evaluation Questions and Answers Rated A+

Document preview thumbnail
Vista previa 4 fuera de 43 páginas

ARE 5.0 Construction & Evaluation Questions and Answers Rated A+ Competitive bid Can be public or private and involves more than 1 contractor Negotiated Bid For privately funded projects, Owner and Architect work with 1 GC to reach a price Why would an Owner hire a Construction Manager as Adviser (CMa)? To assist in project delivery by providing cost estimating, scheduling, and construction contract management services to the Owner Which project delivery limits the role and responsibilities of the Architect during preconstruction? IPD Who is responsible for cost control in design-build delivery? The GC (Architect is responsible for controlling cost of design services) Who must approve a proposed substitution? If approved, what is done with the proposal? Architect. If approved, it becomes an addendum to be included in the bid documents Who is the only party who guarantees by contract all construction costs? GC At a public hearing, which two items are announced by the Architect after each bid is opened? - Bid amount - Whether bidder has submitted the required supporting documentation According to B101 (O+A), what form of dispute resolution must be tried before arbitration? Mediation What other construction delivery method is most similar to the Construction Manager as Constructor (CMc) with regard to the many roles and responsibilities of the Architect? Design-Bid-Build During agency review, what is the Architect's role in an IPD project? Working with AHJ to show code compliance related to the BIM model What is the purpose of the Architect's site observation? - Becoming generally familiar w/ progress and quality of the work & to keep Owner informed - Endeavoring to guard Owner against defects and deficiencies in the work - Determining if the work is progressing in such a way that it will be in accordance w/ CDs when completed What is the Architect not responsible for during the construction of the project? - Exhaustive or continuous on-site inspections - Means and methods of construction - Site safety Who pays for additional field testing if the work does not conform with the contract documents? GC pays to correct the work, subsequent testing, and compensation for Architect's services related to the issue During construction, why must the Architect speak directly to the GC and not the subcontractors? Architect is an agent of the Owner who does not have a contractual relationship with subcontractors Which document defines the lines of communication among parties during CA? A201 - General Conditions of the Contract for Construction Through whom must the owner and GC communicate during CA? Architect Who will pay for work to be uncovered when the work was covered contrary to the architect's request? GC If uncovered work is determined to meet project requirements, and the architect had not previously requested that it remain uncovered, who pays to uncover and replace the work? Owner Special Inspections Required by Ch. 17 IBC, verifies that work is being performed in accordance with AHJ-approved plans and specifications (ex. pre-fab items, steel, concrete, spray-fireproofing) Who


Información del documento

Subido en
3 de octubre de 2023
Número de páginas
43
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas
$12.49

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
StellarScores
4.0
(517)
Vendido
2003
Seguidores
867
Artículos
21200
Última venta
1 día hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes

Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.