CDT EXAM PREP 1-4 {QUESTIONS WITH CORRECT ANSWERS}.
CDT EXAM PREP 1-4 {QUESTIONS WITH CORRECT ANSWERS}. Bidding documents are considered legal documents? ▪ True. ▪ False. -CORRECT ANSWER-False Codes governing commercial construction and residential construction are different? ▪ True. ▪ False. -CORRECT ANSWER-True The A/E usually hires a construction manager? -CORRECT ANSWER-False The Owner, Contractor and A/E are parties to the construction agreement? ▪ True. ▪False. -CORRECT ANSWER-False There are no differences between the AIA and EJCDC general conditions? ▪ True. ▪False. -CORRECT ANSWER-False The drawings take precedence over the specifications? ▪ True. ▪False. -CORRECT ANSWER-False The role of a subcontractor is the same as a material supplier? ▪ True. ▪ False. -CORRECT ANSWER-False The supplementary conditions should be coordinated with the Owner/A/E agreement? ▪ True. ▪Fals -CORRECT ANSWER-True nProject descriptions and outline specifications are legal and binding documents? ▪ True. ▪False -CORRECT ANSWER-False nThe contractor and the A/E review submittals for the same reasons and from the same point of view? ▪ True. ▪False -CORRECT ANSWER-F In 1964, the term "Project Manual" was introduced by the: A. American Bar Association. B. American Institute of Architects. C. Construction Specifications Institute. D. Department of Defense. -CORRECT ANSWER-B Uniform Location of Subject Matterprepared by the EJCDC and jointly published by EJCDC and AIA provides a recommended location of topics in all of the following EXCEPT: A. Supplementary Conditions. B. Division 01. C. Agreement. D. Drawings. -CORRECT ANSWER-D During the Planning/Pre-Design stage, the A/E may be retained to: A. Develop outline specifications. B. Describe the character of the mechanical system. C. Prepare renderings. D.Assist in financial feasibility studies -CORRECT ANSWER-D During which project phase does the A/E review the Owner's program and budget requirements and suggest alternative approaches? A. Planning/Pre-Design. B. Design. C. Bidding/Negotiation. D. Construction. E. Post-Construction. -CORRECT ANSWER-B A project's "life cycle" includes all of the following EXCEPT? A. Planning/Design. B. Financing. C. Construction. D. Evaluation. E. Demolition. -CORRECT ANSWER-B nThe Specification-type document prepared during the Design Development phase is called the: A. Outline Specification. B. Rough Draft Specification. C. UniFormat Elements. -CORRECT ANSWER-A nThe contractual
Escuela, estudio y materia
- Institución
- CDT
- Grado
- CDT
Información del documento
- Subido en
- 28 de septiembre de 2023
- Número de páginas
- 27
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
cdt exam prep 1 4 questions with correct answers
-
bidding documents are considered legal documents
-
codes governing commercial construction and reside
-
there are no differences between the aia and ejcdc
Documento también disponible en un lote