GCSS-Army Watercraft in GCSS-Army Test 1 with well explained answers
1. When creating an OBSL work order, the 4 low priority list item is selected. - b. FALSE 2. When a change is made to the OBSL BOM, a new XML file is received into GCSS-Army via the ______, which results in an update to the existing OBSL BOM. - d. SAP Business Workplace 3. The Open Web Service (OWS)/Universal Data Exchange (UDEx) Interface links information from the ______ to GCSS-Army. - b. Logistics Support Vessel (LSV) 4. When installing equipment a(n) _____notification must be created. - b. D1 Notification 5. The intent of the OBSL work order is to be able to compare the OBSL material requirement quantities with the ______. - a. On-hand material quantities 6. The nomenclature for the OBSL work order description is the OBSL, followed by the watercraft vessel ______. - c. Advanced Shipment Notification (ASN) Number 7. True or False? The OBSL work order is not to be released. - a. TRUE 8. The OBSL work order that is created for a watercraft mission is used for material replenishment. - b. FALSE 9. The ______ is used to view the provisional on-hand material quantities. - b. BOM History (ZBOMHIST) 10. True or False? The Material Situation Report (/ISDFPS/DISP_MAT_SIT) is used to establish and to manage the provisional safety stock requirements. -a. TRUE
Escuela, estudio y materia
- Institución
- GCSS-Army Watercraft in GCSS-Army
- Grado
- GCSS-Army Watercraft in GCSS-Army
Información del documento
- Subido en
- 10 de septiembre de 2023
- Número de páginas
- 2
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
gcss army watercraft in gcss army
Documento también disponible en un lote