Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWE

Puntuación
-
Vendido
-
Páginas
7
Grado
A+
Subido en
21-08-2023
Escrito en
2023/2024

FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWERED FPM 120A Module 3 exam WELL ANSWERED

Mostrar más Leer menos
Institución
FPM 120A Module 3
Grado
FPM 120A Module 3

Vista previa del contenido

FPM 120A Module 3 exam
Module 3 Exam

1. Which of the four steps for managing requirements are you performing when you break down
high-level requirements into detailed requirements?
a. Verify and Validate the requirements will achieve the goal
b. Document attribute descriptions
c. Discover attributes the solution must have
d. trace
2. Cost estimates should include costs for all of the following expect,
a. Labor
b. Materials
c. Unanticipated fees
d. Equipment
3. Which of the following criteria does the requirement, “Radios must possess long lasting
batteries”, fail to meet?
a. Requirements must be unambiguous
b. Requirements must be consistent
c. Requirements must be modifiable
d. Requirements must be compatible
4.
5.
6.
7.
8. Which of the four steps for managing requirements are you performing when you determine
that the requirement supports achieving the goal and it describes an outcome that the end-
user still desires?
a. Discover
b. Verify and Validate
c. Trace requirements back to its source
d. Document
9. There are four paths through the network of tasks on your project; Path A, Path b, Path C, and
Path D. their durations are: Path A-138days, PathB-154-days, Path C-165days, and Path D-
166days. Which path represents your project’s critical path?
a. Path D
b. Path C
c. Path A
d. Path B
10. Which risk response eliminates the risk entirely by changing some part of the Project
Management Plan?
a. Mitigat
eb.
Transfer
c.
Accep
td. Avoid



This study source was downloaded by 100000844265907 from CourseHero.com on 08-20-2023 19:50:20 GMT -05:00


https://www.coursehero.com/file/77094513/FPM-120A-Module-3docx/

, 11. Which of the four steps for managing requirements are you performing when you identify the
reason the requirement was established and identify which other requirements it supports or
is supported by?
Trace requirements back to its source
a. Discover attributes the solution must have
b. Verify and validate the requirements will achieve the
goald. Document attribute descriptions
12. Which of the following is a characteristic of a performance -based requirement?
a. Increases costs and generates ineffective solutions to produce the desired
outcomesb. Describes the desired outcomes that will result from meeting the
requirement
c. Prevents the developer from exploring alternative ways to achieve the
requirementd. Descries a specific method for obtaining the desired outcome
13. Which type of cost estimating technique uses actual data, not predictions, from similar
projects?
a. Three-Point Estimating
b. Parametric estimating
c. Expert judgment
estimatingd. Analogous
estimating
14. You, the project manager. And the project team have determined the resources necessary for
your project, developed a cost estimate, and submitted the project budget for approval. The
processes result in which bassline?
a. Budget Baseline
b. Schedule Baseline
c. Cost Baseline
d. Scope Baseline
15. Which of the following statements is true of project work breakdown structures?
a. They provide the total lifecycle costs of a project
b. They are not used on small projects
c. Once they are created, they are final and cannot be
changedd. They define the total project scope
16. Which of the following tools is typically used to assign resource to project tasks?
a. Network Diagram
b. Milestone Chart
c. Gantt Chart
d. Responsibility Assignment Matrix
17. Which of the following occurs during the execution stage of the integrated Baseline Review
(IBR)?
a. An assessment of the project scope against approved plans is conducted
b. IBR objectives are researched and adjudicated
c. The review team is assembled to establish IBR objectives
d. The performance measurement baseline is managed and updated to provide
anaccurate depiction of project work
18. Which of the following schedule compression techniques is accomplished by making changes
to when the work is performed?

This study source was downloaded by 100000844265907 from CourseHero.com on 08-20-2023 19:50:20 GMT -05:00


https://www.coursehero.com/file/77094513/FPM-120A-Module-3docx/

Escuela, estudio y materia

Institución
FPM 120A Module 3
Grado
FPM 120A Module 3

Información del documento

Subido en
21 de agosto de 2023
Número de páginas
7
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$9.99
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BestTutor001 Chamberlain School Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
28
Miembro desde
5 año
Número de seguidores
9
Documentos
2621
Última venta
3 semanas hace
Best Tutor 001

BEST TUTOR 001 SAYS Knowledge should not be expensive and everyone deserve to get quality knoweldge. we are in the world of competition and challenges, and we study to adapt to any changes we face in the near future. Changing psychological behavior that are accepted in the society is what all about knoweldge. Our role is to give back to the society and share the ideas with the people who doesn't understand. For complete and detail solution contact me,credibility and fulfillment . I am devoted individual with the point of helping understudies to succeed in the task and exams, I don't just give structured arrangements/solution for the posted question but also provide complete and ensure you comprehend the concepts of the said theme BEST TUTOR 001 EIS HERE TO HELP YOU

Lee mas Leer menos
3.0

3 reseñas

5
0
4
1
3
1
2
1
1
0

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes