CTS Exam Prep Questions and answers, 100% Accurate. Verified. What are the four teams that comprise the overall Project Team? - -Owner, Design, Installation, and Management Who would belong to the Design team? - -Anyone with Consultant in their title except the moving consultant Which groups make up the Management Team? - -Developer, Construction Manager, and Building Management Agency The End-User, Facility Manager and Building Committee comprise which team within the Project Team? - -Owner Which group represent the generic roles that are important to the Project process? - -Project Managers, Designers and Installers Which project characteristics must be considered in order to determine which method is best suited for a particular project? - -Schedule, Size, Type, Complexity, and Procurement Requirements What is an important aspect of funding that has a direct impact on the project process and design/installation? - -Technical Support Funding Whether a construction project is large or small, which milestones must be achieved in a typical schedule? - -Programming, Building Design, AV Bid, and Move-In What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for? - -Long term projects with extended project cycles What is the risk in using an OFE/Integrator Installed contract structure? - -System and infrastructure design and facility functionality may suffer What are some of the important project scope and size considerations in selecting an AV provider? - -Financial Stability, Current Workload, and Company Credentials What type of document typically includes Project Size Requirements, Corporate Profile, Team Personnel, and Warranty Response Time? - -RFQ a significant difference between the Two-Envelope Bid Method and the Qualifications- Based Selection Method? - -Negotiate with the highest ranking firm to finalize the contract What is one of the disadvantages of contracting the AV integrator to the electrical subcontractor? - -More layers of responsibility and communication When conducting a complete project bid process, what milestone follows the issuing of the RFP? - -Pre-Bid Meeting Under what circumstances would you likely use an A305-1986 form? - -Scoring responses to an RFQ What is the ideal way to contract an AV integrator? - -Directly to the Owner The process of identifying the activities that end-users need to perform, and developing the functional descriptions of your systems is referred to as:? - -Needs Analysis What is the main task of the third Step of the Program Phase of a Project? - -Conducting program meetings What should be included in

Mostrar más Leer menos
Institución
Grado










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

Subido en
12 de agosto de 2023
Número de páginas
26
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

CTS Exam Prep Questions and answers,
100% Accurate. Verified.

What are the four teams that comprise the overall Project Team? - ✔✔-Owner, Design, Installation, and
Management



Who would belong to the Design team? - ✔✔-Anyone with Consultant in their title except the moving
consultant



Which groups make up the Management Team? - ✔✔-Developer, Construction Manager, and Building
Management Agency



The End-User, Facility Manager and Building Committee comprise which team within the Project Team?
- ✔✔-Owner



Which group represent the generic roles that are important to the Project process? - ✔✔-Project
Managers, Designers and Installers



Which project characteristics must be considered in order to determine which method is best suited for
a particular project? - ✔✔-Schedule, Size, Type, Complexity, and Procurement Requirements



What is an important aspect of funding that has a direct impact on the project process and
design/installation? - ✔✔-Technical Support Funding



Whether a construction project is large or small, which milestones must be achieved in a typical
schedule? - ✔✔-Programming, Building Design, AV Bid, and Move-In



What type of project is a typical Consultant-Led Design-Bid-Build contract structure good for? - ✔✔-Long
term projects with extended project cycles

,What is the risk in using an OFE/Integrator Installed contract structure? - ✔✔-System and infrastructure
design and facility functionality may suffer



What are some of the important project scope and size considerations in selecting an AV provider? -
✔✔-Financial Stability, Current Workload, and Company Credentials



What type of document typically includes Project Size Requirements, Corporate Profile, Team Personnel,
and Warranty Response Time? - ✔✔-RFQ



a significant difference between the Two-Envelope Bid

Method and the Qualifications- Based Selection Method? - ✔✔-Negotiate with the highest ranking firm
to finalize the contract



What is one of the disadvantages of contracting the AV integrator to the electrical

subcontractor? - ✔✔-More layers of responsibility and communication



When conducting a complete project bid process, what milestone follows the issuing of the RFP? - ✔✔-
Pre-Bid Meeting



Under what circumstances would you likely use an A305-1986 form? - ✔✔-Scoring responses to an RFQ



What is the ideal way to contract an AV integrator? - ✔✔-Directly to the Owner



The process of identifying the activities that end-users need to perform, and developing the functional
descriptions of your systems is referred to as:? - ✔✔-Needs Analysis



What is the main task of the third Step of the Program Phase of a Project? - ✔✔-Conducting program
meetings



What should be included in the written Program Report? - ✔✔-...A conceptual and functional system
description

, The more accurate means to estimate dimensions of a commercial space during a site inspection would
be to? - ✔✔-Count Ceiling Tiles in a drop tile instalation



A client requires a new boardroom. The sales person and engineer are sent to the premises to measure
the facility and talk to the client. At this stage they should be performing a _ - ✔✔-Needs Analysis



Sightlines for audience viewing in a given presentation space can be improved by: - ✔✔-Providing a
sloped, or stepped, seating arrangement



After presenting a proposal, what is the correct plan of action for following up with the client? - ✔✔-
Regularly, until a decision is made



AV professionals determine the end user's needs by examining three things: the required applications,
the tasks, and the: - ✔✔-Functions to support the applications



When working with a client to design an AV solution for a new conference center, the client requests a
detailed budget for the equipment and installation. What phase is the project in? - ✔✔-Design phase



The HDTV aspect ratio is equal to which of the following? - ✔✔-1.78:1



Please select the appropriate resolution for SXGA. - ✔✔-1280 x 1024



The Brightness control adjusts which level? - ✔✔-Black Level



For what purpose would the AV technician designate a loopback internet protocol address in the
127.0.0.1 to 127.255.255.254 range in a network configuration? - ✔✔-To test the local device to see if
TCP/IP is working on your system



It is important to consider Polar Patterns when____ - ✔✔-Selecting Microphones for use at live events
$10.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
PassPoint02 Chamberlain School Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
173
Miembro desde
3 año
Número de seguidores
105
Documentos
4552
Última venta
6 días hace

4.1

39 reseñas

5
22
4
6
3
5
2
4
1
2

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes