100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

Redefine Your Study Habits with the [Managerial Accounting for Managers,Noreen,4e] 2024 Test Bank

Puntuación
-
Vendido
-
Páginas
5525
Grado
A+
Subido en
12-08-2023
Escrito en
2023/2024

Give your study sessions a boost with the Test Bank for [Managerial Accounting for Managers,Noreen,4e]. Curated with a variety of practice exam questions based on official exams, it ensures your preparation is comprehensive and effective. The detailed answers further enhance your understanding, paving your path to pass the class. Let the academic year of be your time to shine.

Mostrar más Leer menos
Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
12 de agosto de 2023
Número de páginas
5525
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Appendix 2A


Least Squares Regression Computations



True / False Questions



1. (Appendix 2A) The R2 (i.e., R-squared) is a measure of the goodness-of-fit in least-squares

regression.



True False


2. (Appendix 2A) When analyzing a mixed cost, you should always plot the data in a scattergraph,
but it is particularly important to check the data visually on a scattergraph when the R 2 from a

least squares regression is low. A quick look at the scattergraph can reveal that there is little

relation between the cost and the activity or that the relation is something other than a simple

straight line.



True False




Multiple Choice Questions




App02A-1
Copyright © 2017 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.

,3. (Appendix 2A) _________________ is a method of separating a mixed cost into its fixed and

variable elements by fitting a line to the data that minimizes the sum of the squared errors.




A. Account analysis

B. Scattergraph

C. High-low

D. Least-square regression


4. (Appendix 2A) Your boss would like you to estimate the fixed and variable components of a

particular cost. Actual data for this cost over four recent periods appear below.


Activity Cost

Period 1 24 $174

Period 2 25 $179

Period 3 20 $165

Period 4 22 $169


Using the least-squares regression method, what is the cost formula for this cost?




A. Y = $0.00 + $7.55X

B. Y = $110.44 + $2.70X

C. Y = $103.38 + $3.00X

D. Y = $113.35 + $0.89X




App02A-2
Copyright © 2017 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.

,5. (Appendix 2A) The management of Bandle Corporation would like for you to analyze their repair

costs, which are listed below:


Machine-Hours Repair Costs

March 6,966 $102,067

April 6,952 $101,966

May 6,924 $101,759

June 6,967 $102,072

July 6,963 $102,027

August 6,996 $102,243

September 6,964 $102,031

October 6,926 $101,776


Management believes that repair cost is a mixed cost that depends on the number of machine-

hours. Using the least-squares regression method, the estimates of the variable and fixed

components of repair cost would be closest to:




A. $6.72 per machine-hour plus $55,230 per month

B. $6.80 per machine-hour plus $54,679 per month

C. $7.28 per machine-hour plus $51,389 per month

D. $14.66 per machine-hour plus $101,993 per month




App02A-3
Copyright © 2017 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.

, 6. (Appendix 2A) Laborn Inc.'s inspection costs are listed below:


Units Produced Inspection Costs

March 265 $11,254

April 248 $10,684

May 272 $11,516

June 235 $10,210

July 207 $9,258

August 217 $9,578

September 261 $11,108

October 274 $11,578


Management believes that inspection cost is a mixed cost that depends on the number of units

produced. Using the least-squares regression method, the estimates of the variable and fixed

components of inspection cost would be closest to:




A. $43.04 per unit plus $10,648 per month

B. $34.63 per unit plus $2,089 per month

C. $34.78 per unit plus $2,044 per month

D. $36.00 per unit plus $1,714 per month




App02A-4
Copyright © 2017 McGraw-Hill Education. All rights reserved. No reproduction or distribution without the prior written consent of
McGraw-Hill Education.
$37.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
PracticeExams my own
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
316
Miembro desde
2 año
Número de seguidores
194
Documentos
3272
Última venta
1 mes hace
ExamPrepZone

4.1

41 reseñas

5
25
4
4
3
7
2
2
1
3

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes