100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

[Solution Available] FIN 301 Penn State World Campus Final Excel project

Puntuación
-
Vendido
-
Páginas
14
Grado
A+
Subido en
12-08-2023
Escrito en
2023/2024

FIN 301 Penn State World Campus Final Excel project Scenario: Tom Jones, the CFO for the firm PSUWC Energy, LLC, woke up with a start at 4:00 am on July 2, 2012, due to his phone ringing. It was his senior financial analyst, vacationing in Europe, calling with bad news. Tom was supposed to present his project evaluation, at the end of the week, for the Board's proposal that they invest in new equipment that generates electricity, using a new nuclear technology. His staff of financial analysts had been working hard over the last few weeks collecting data and had prepared a model creating a financial forecast about the proposed project's viability. Disaster had struck on the night of July 1'st wherein malware all but wiped out the work of the analysts. Tom needed to prepare a financial analysis of the project to present the Board with his recommendations. All the staff had already left for the July 4th vacation and Tom was on his own. Tom quickly reached his office and managed to salvage what was left of the excel spreadsheet prepared for the presentation. The excel file is attached to this document. What follows is some basic information that Tom knew and was able to retrieve about the project. PSUWC's existing plant has excess capacity, in a fully depreciated building, to install and run the new equipment. Due to relatively rapid advances in the technology, the project was expected to be discontinued in six years. The proposed project was capable of providing 35,000 kW1 per hour power. Typically, PSUWC ran its plants 24 hours a day, 7 days a week at an average of 58% Capacity factor2, which is what the project would start with. However, his engineers had assured him that the implementation of the new technology would enable them to increase their capacity factor by 15% a year till they reached a 100% capacity factor. A total investment of $34 Million USD for new equipment was required. The equipment had fixed maintenance contracts of $4,000,000 per year with a salvage value of $7,000,000 and variable costs were 50% of revenues. The new equipment would be depreciated to zero using straight line depreciation. The new project required an increase in working capital of $6,000,000 and $1,000,000 of this increase would be offset with accounts payable. PSUWC would be able to sell all the electricity it generated at the rate of $0.15 per kilo-watt hour in the market they served. 1 kW stands for kilo-watt or 1000 watts. A watt is a measure of power. Electricity is priced in kWh (kilo-watt hours). 1 kilo-watt hour represents 1000 Watts of power expended for one hour (1 h) of time. The average price people in the U.S. pay for electricity is about 12 cents per kilowatt-hour. (Context: A typical U.S. household uses about 908 kWh a month of electricity.) 2 The net capacity factor of a power plant is the ratio of its actual output over a period of time, to its potential output if it were possible for it to operate at full nameplate capacity continuously over the same period of time. To calculate the capacity factor, take the total amount of energy the plant produced during a period of time and divide by the amount of energy the plant would have produced at full capacity. Capacity factors vary greatly depending on the type of fuel that is used and the design of the plant. The corporate tax rate was 35 percent and PSUWC currently has 1,000,000 shares of stock outstanding at a current price of $16. The company also has 30,000 bonds outstanding, with a current price of $960. The bonds pay interest semi-annually at the coupon rate is 5.6%. The bonds have a par value of $1,000 and will mature in twenty years. Even though the company has stock outstanding it is not publicly traded. Therefore, there is no publicly available financial information. However, management believes that given the industry they are in the most reasonable comparable publicly traded company is Companhia Paranaense de Energia - COPEL (NYSE Ticker Symbol ELP)3. In addition, management believes the S&P 500 is a reasonable proxy for the market portfolio. Therefore, the cost of equity is calculated using the beta from ELP and the market risk premium based on the S&P 500 annual expected rate of return4. Tom knew that because of the size of the proposed project, he had to take into account the change in capital structure the new project would cause his firm. To this end, he had a choice between raising the new capital needed either using 75/25% split between issuing bonds/equity or a 25/75% split between issuing bonds/equity5. The bonds would have to be retired at the end of the project's life6. Tom knew that the cost of debt would depend on the new D/E ratio that the firm would have based on his decision to raise capital. Tom looked at the worksheet titled

Mostrar más Leer menos
Institución
FIN 301 Penn
Grado
FIN 301 Penn









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
FIN 301 Penn
Grado
FIN 301 Penn

Información del documento

Subido en
12 de agosto de 2023
Número de páginas
14
Escrito en
2023/2024
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$13.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Andymoh Chamberlain College Of Nursing
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
3223
Miembro desde
4 año
Número de seguidores
2383
Documentos
4508
Última venta
4 horas hace
QUALITY DOCUMENTS FOR BEST RESULTS.

In my page you will find latest Exams, Test Banks,Solutions Manual, Exam Elaboration, Discussions, Case Studies,Essays etc. I upload quality and verified documents at an affordable price. Also check out the package deal and be guaranteed to pass. Help others to benefit from this study materials by leaving a review, SUCCESS.

4.1

655 reseñas

5
392
4
111
3
63
2
23
1
66

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes