NICET LEVEL III Water Based Layout Questions with Correct Answers.
General Conditions Correct Answer What is not included in the technical specification? •contract •specifications •contract drawings Correct Answer Bid documents include? General Conditions Correct Answer Codes, standards, Authority Having Jurisdiction (AHJ), clean-up, safety requirements, barricades, fencing, insurance and bond requirements, ect. Supplementary Conditions Correct Answer Addendums, time schedules, working days allowed, delay agreements, payment schedules Construction Specifications Institute (CSI) Correct Answer Specifications typically use what format? Contractors Correct Answer Construction manager concept is when the owner contracts with the construction manager who oversees ____________ working on the project Design-Build Concept Correct Answer Sometimes referred to as a turn-key type agreement or contract? general contractor Correct Answer Multiple Prime Contractor Method has the intent is eliminate the middleman __________ __________. •architectural/structural contractor •mechanical contractor •electrical contractor Correct Answer Multiple prime contractor method involve more than one prime contractor which consist of? •federal government •general services administration (GSA) •large companies Correct Answer Who commonly uses the multiple prime contractor method? Owner, architect, general contractor, subcontractor Correct Answer Traditional method contract uses the typical chain of command which is? •open bid method •bid-by invitation procedure
Escuela, estudio y materia
- Institución
- NICET LEVEL III
- Grado
- NICET LEVEL III
Información del documento
- Subido en
- 2 de agosto de 2023
- Número de páginas
- 15
- Escrito en
- 2023/2024
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
general conditions
Documento también disponible en un lote