ACI Concrete Strength Testing Technician CP-19 (14) questions with correct answers
These procedures for capping enable concrete cylinders and cores to meet the standard's requirements for ________ and _________. Answer Planeness, perpendicularity Equipment needed for the capping process includes capping _____ , _____devices, and ______ pots. Answer Plates, alignment, melting Plates for neat cement and high strength gypsum plaster caps should be made of _____, _____, _____ or _____. Answer Glass, metal granite or diabase Sulfur mortar cap plates should be formed against _____ or _____ plates. Answer Metal, Stone The purpose of the guide bar or bull's eye level is to ensure that caps remain perpendicular to the axis of the cylinder within 0.5 degrees. True or False? Answer True To avoid accidents during reheating of cooled sulfur, use melting pots that have _____. Answer Peripheral heating
Escuela, estudio y materia
- Institución
- Field tech
- Grado
- Field tech
Información del documento
- Subido en
- 15 de julio de 2023
- Número de páginas
- 11
- Escrito en
- 2022/2023
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
aci concrete strength testing technician cp 19 14
Documento también disponible en un lote