100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

ACI Concrete Field Testing Technician- Grade I Exam Questions with correct Answers

Puntuación
5.0
(1)
Vendido
7
Páginas
11
Grado
A+
Subido en
12-07-2023
Escrito en
2022/2023

ACI Concrete Field Testing Technician- Grade I Exam Questions with correct Answers

Institución
ACI Concrete
Grado
ACI Concrete









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
ACI Concrete
Grado
ACI Concrete

Información del documento

Subido en
12 de julio de 2023
Número de páginas
11
Escrito en
2022/2023
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

ACI Concrete Field Testing Technician- Grade I Exam Questions with correct Answers The sensor of the temperature measuring device shall be submerged a minimum of _____ in. [_____mm] into the freshly mixed concrete. - Answer- 3 in. [75 mm]
The temperature measuring device shall have a capacity of measuring temperature of freshly mixed concrete to +- _____ degrees F [+- _____ C] throughout a range of _____. - Answer- 1 degree F [0.5 C], 30 degrees F to 120 F [0 C to 50 C]
The temperature measuring device shall be calibrated _____, or whenever there is a question of _____. - Answer- Annually, accuracy
The temperature of concrete may be measured in a wheelbarrow. True or False? - Answer- True
The temperature of concrete may be measured in a wall form. True of False - Answer- True
A composite sample of concrete is required even if the only purpose for obtaining the sample is to determine temperature. True of False? - Answer- False
What must be done to the sample container prior to sampling the concrete? - Answer- Dampen (with water)
What must be done to the concrete surrounding the temperature measuring device after
the device is submerged in the fresh concrete. - Answer- Gently press the concrete around the temperature measuring device at the surface of the concrete
How long must the temperature measuring device remain in the freshly mixed concrete?
- Answer- At least 2 minutes but not more than 5 minutes
After the temperature of the concrete is read, what is required? - Answer- Reporting of temperature
The temperature of concrete is reported to the nearest _____ degrees F [_____ C] - Answer- 1 degree F [0.5 C]
According to ASTM C1064, what is one reason to take the temperature of concrete? - Answer- Verify conformance to a specified requirement for temperature of concrete A maximum temperature of freshly mixed concrete is specified in ASTM C1064. True of False? - Answer- False
The sample of concrete used for temperature determination must be rodded 25 times. True or False? - Answer- False
Sampling by this method is required when tests are to be made to determine _____ with
specification requirements. - Answer- Compliance
This method covers sampling from four types of mixtures which are _____, _____, _____, and _____. - Answer- Stationary mixers, paving mixers, revolving drum mixers, and open top mixers
The maximum allowable time between obtaining the first and final portions of a composite sample is _____ minutes. - Answer- 15
Portions of a composite sample shall be thoroughly remixed bfore beginning tests on the sample. True of False? - Answer- True
The maximum elapsed time allowed between obtaining the final portion of the composite sample and beginning the tests for slump, temperature, and air content is _____ minutes. - Answer- 5
The molding of strength test specimens shall begin within _____ minutes after fabricating the composite sample. - Answer- 15
The concrete sample must be protected from contamination and _____. - Answer- Rapid evaporation
The minimum size sample for making strength test specimens is _____. - Answer- 28 L (1ft^3)
When sampling from a stationary mixer, the batch must be sampled at _____ or more regularly spaced intervals during discharge of the middle portion of the batch - Answer- 2
The composite sample for a paving mixer must represent a minimum of _____ different portions of the batch of concrete taken from the pile after discharge. - Answer- 5
When sampling from a revolving drum truck mixer, concrete must be sampled at a minimum of _____ regularly spaced intervals during discharge of the middle portion of this batch. - Answer- 2
Concrete samples from a truck mixer must be obtained before any water or admixtures are added to the mixer at the job site. True or False? - Answer- False
$12.49
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Reseñas de compradores verificados

Se muestran los comentarios
1 año hace

5.0

1 reseñas

5
1
4
0
3
0
2
0
1
0
Reseñas confiables sobre Stuvia

Todas las reseñas las realizan usuarios reales de Stuvia después de compras verificadas.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
millyphilip West Virginia University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2812
Miembro desde
3 año
Número de seguidores
1959
Documentos
40914
Última venta
2 días hace
white orchid store

EXCELLENCY IN ACCADEMIC MATERIALS ie exams, study guides, testbanks ,case, case study etc

3.7

534 reseñas

5
234
4
83
3
103
2
31
1
83

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes