100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Sled Manufacturing budgeted 10,000 widgets for production during 201

Puntuación
-
Vendido
-
Páginas
1
Grado
A
Subido en
27-06-2023
Escrito en
2022/2023

Sled Manufacturing budgeted 10,000 widgets for production during 2012. Sled has capacity to produce 12,000 units. Fixed factory overhead is allocated to production. The following estimated costs were provided: Direct material ($14/unit)$ 140,000 Direct labor ($30/hr. Solution Hi, Part 1 Sales Value (1000*86) = 86000 Variable Cost Direct Material (1000*14) = 14000 Direct Labor (1000*2*30) = 60000 Variable Manu. Overhead (1000*6) = 6000 Contribution = = 6000 (Order should be accepted as it generates an additional margin of $ 6000. Part 2 If produced self = total variable cost = 14 + 60 +6 = 80 If obtained from outside = 78 Fixed cost will have to be incurred in both the cases. Since the cost of procurement from outside is lesser than in-house variable cost, sled should give the order to outside supplier. Thanks, Aman

Mostrar más Leer menos
Institución
Grado








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Grado

Información del documento

Subido en
27 de junio de 2023
Número de páginas
1
Escrito en
2022/2023
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Sled Manufacturing budgeted 10,000 widgets for production during 2012. Sled has capacity to
produce 12,000 units. Fixed factory overhead is allocated to production. The following estimated
costs were provided: Direct material ($14/unit)$ 140,000 Direct labor ($30/hr.


Solution
Hi, Part 1 Sales Value (1000*86) = 86000 Variable Cost Direct Material
(1000*14) = 14000 Direct Labor (1000*2*30) = 60000 Variable Manu. Overhead (1000*6) =
6000 Contribution = 86000 - 14000 - 60000 - 6000 = 6000 (Order should be accepted as it
generates an additional margin of $ 6000. Part 2 If produced self = total variable cost = 14 +
60 +6 = 80 If obtained from outside = 78 Fixed cost will have to be incurred in both the cases.
Since the cost of procurement from outside is lesser than in-house variable cost, sled should give
the order to outside supplier. Thanks, Aman
$8.36
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
meejuhaszjasmynspe52866

Conoce al vendedor

Seller avatar
meejuhaszjasmynspe52866 Self
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
0
Miembro desde
2 año
Número de seguidores
0
Documentos
338
Última venta
-

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes