CE 315 MT1 100% SOLUTIONS QUESTION AND ANSWER In the Earned Value Analysis we found: BCWP= $56,500 BCWS=$62500 ACWP= $6500 (Circle the best result that applies a) Behind Schedule and Over-Budget b)Behind Schedule and Under-Budget c)Ahead of Schedule and Over-Budget d)Ahead of Schedule and Over-Budget - ANSWER a) Behind Schedule and OverBudget SPI= BCWP/BCWS = .904 less than one (behind) CPI= BCWP/ACWP = .869 less than one (over) Free Float represents a) the portion of total float where it is not influenced by preceding activities b) the portion of total float where it does not influence following activities c) a and b d) none - ANSWER b) the portion of total float where it does not influence following activities Where there is a 5-day lag between the end of activity A and the start of activity of B, then: a) Activity B has to wait exactly 5 days after the completion of Activity A before it can start b) Activity B has to wait at least 5 days after the completion of Activity A before it can start c) Activity B has to wait at most 5 days after the completion of Activity A before it can start d) Activity B cannot take more than 5 days in duration - ANSWER b) Activity B has to wait at least 5 days after the completion of Activity A before it can start Your critical path is 59 days long. The next longest path is 56 days a) if you extend the longest path by 5 days, the entire projects duration will increase by 5 days. true or false - ANSWER true
Escuela, estudio y materia
- Institución
- Mt1
- Grado
- Mt1
Información del documento
- Subido en
- 30 de mayo de 2023
- Número de páginas
- 12
- Escrito en
- 2022/2023
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
ce 315
-
ce 315 mt1 100 solutions question and answer
-
mt
-
in the earned value analysis we found bcwp 56
-
500 bcws62500 acwp 6500 circle the best result that applies a behind schedule and over