GCSS-Army Maintenance Supervisor's Course Test 1 Already Passed
1. __________ are used to schedule preventive services and inspections. d. Maintenance Plans 2. A single-cycle maintenance plan is used to schedule services using either a ________ or a ________. a. Date cycle, counter cycle 3. The __________ transaction can be used to change, activate/deactivate, and flag/unflag a maintenance plan for deletion. d. IP02 4. What process within GCSS-Army calculates the quantities needed to satisfy projected consumption or to meet immediate requirements? b. Material Requirements Planning (MRP) 5. What does the "P" indicate behind the MRP area when displaying the details of the DODAAC Report (ZFE)? d. That this is a Provisional MRP Area
Escuela, estudio y materia
- Institución
- GCSS
- Grado
- GCSS
Información del documento
- Subido en
- 24 de mayo de 2023
- Número de páginas
- 3
- Escrito en
- 2022/2023
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
gcss army maintenance supervisors course test 1 already passed
Documento también disponible en un lote