ACQ 202 Module 3 Exam: Part III Designing - Prototyping the System Already Passed
ACQ 202 Module 3 Exam: Part III Designing - Prototyping the System Already Passed Productivity, rework, and technology impact are examples of which kind of software metric? [28f. Using DoD Practical Software Measurement methodology principles, select appropriate software measures to make sound decisions regarding acquisition of software intensive systems.] Resource allocation --> Process Management Quality The extent of developmental testing and evaluation necessary on a commercial or non-developmental item depends on __________. [29e. Identify key issues regarding Test and Evaluation (T&E) of commercial and non-developmental (NDI) items.] --> The amount of modification required, the environment in which the item will be used, and the availability of test results. The availability of contractor logistics support for the item once it is fielded. The discretion of the Program Manager. The degree of early operational assessment (EOA) that can be conducted prior to the start of Low Rate Initial Production (LRIP). Changes made late in development or early in production usually have less impact on program cost and schedule than changes made early. [36a. Recognize the impact of manufacturing on cost, schedule and performance.] True --> False A Fixed-Price Incentive (Firm Target) (FPIF) contract is awarded for $25 million to design a computer based training course for the Air Force with a period of performance of 18 months. What reports, if any, must the Air Force Program Manager (PM) require the contractor provide regarding their cost, schedule and technical performance? [21a. Identify performance report tailoring considerations and their effect on reporting.] The contractor would not be required to submit any earned value related reports to the Program Management Office. The contractor would submit an Integrated Program Management Report (IPMR) with formats 1 through 5 only. The contractor would submit an Integrated Program Management Report (IPMR) with formats 1, 5, 6 and 7. The contractor would submit an Integrated Program Management Report (IPMR) with formats 1 only. 5. X The contractor would submit an Integrated Program Management Report (IPMR) with formats 1 through 7. If a computer monitor was initially designed for use in a home or office environment, and the Navy decided to modify it for use on board ship, an early operational assessment (EOA) of that monitor would likely be conducted. [31b. Identify the role of Early Operational Assessment (EOA) and Operational Assessment (OA) in reducing program risk.] --> True False The Integrated Program Management Report has seven formats. Which one of the formats reports current and cumulative performance element data broken out by Contract WBS? [21a Revised: Identify the purpose and content of the Integrate
Escuela, estudio y materia
- Institución
- ACQ 202
- Grado
- ACQ 202
Información del documento
- Subido en
- 17 de mayo de 2023
- Número de páginas
- 9
- Escrito en
- 2022/2023
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
productivity
-
rework
-
acq 202 module 3 exam part iii designing prototyping the system already passed
-
and technology impact are examples of which kind of software metric 28f using dod practical s
Documento también disponible en un lote