College Notes Advanced Planning & Scheduling

Document preview thumbnail
Vista previa 3 fuera de 27 páginas

Dit document is gemaakt tijdens de lessen van APS in de minor Operational Management in Industry op het Windesheim. Dit is het engels en word zo ook getoetst.

Vista previa del contenido

Advanced Planning & Scheduling
Lesson 1 – Chapter 1 + 2 + Appendix C2 and S&OP (Manufacturing)




Difference ERP and APS:
- ERP = transactional system
- Based on MRP-II (Material Requirement Planning)

Work loading:
- Infinite loading = ignores capacity constraints, only helps to
identify bottlenecks
- Finite loading = allows only as much work to be assigned as
can be done with available capacity
APS is:
- Decision making  Computer based
- Allocation  Activities to be done on limited resources
- Business Processes  Manufacturing & service industries
o Procurement, production, transportation, distribution
- Complex  Mathematical techniques & heuristics




1

,Decision making Hierarchy:




Why is planning done hierarchically:
- Certain decisions must be made earlier
o It takes a few years to build a new plant
o It takes several months to hire new people or build new silos
 Exactly what SKU, color, machine, person, sequence on a machine
can be decided later
- Decisions made a higher level determine constraints at lower level
o More constraints on shorter horizon that are the result of earlier decisions
- Uncertainty increases over time
o Range of possible outcomes is larger on longer term
- Aggregated forecasts are usually better
o Longer term forecasts over at family level are more accurate than at SKU
level
- Complexity
o Aggregation is needed at higher level to reduce complexity

S&OP process Different, level different structure &logic




Volume planning = a planning level that does not ‘know’ about orders and which plans
volumes of demand in periods, based on an aggregate resource mode
Order planning = this is the level “where the order comes,” and here the order is
accepted and planned, based on the S&OP plan, more detailed capacity limitations,
and available material on an aggregate level.

Scheduling = this is the level where individual resources or employees are
selected and assigned. In other words, it is where the “what” of the levels above
is translated in a “how” to produce as efficiently as possible




2

, Difference planning & scheduling:
Planning Scheduling
Buckets Bucketless (continuous time)
No sequence Sequencing
No complex constraints, setup times Complex constraints and setup times
Aggregated (families, resource groups) Detailed (SKU, machine/person)




Terminology
- Resource = ‘machine’
Gantt Chart 
- Task = ‘job’
- Job > 1 operations


Product-process matrix




Overview of manufacturing models
Project scheduling Job shop scheduling Lost scheduling
-Precedence constraints -Multiple operations, -Continuous productions
-Typical ojective, minimize different routes -Switching between
makespan -Minimize makespan, products incurs setup cot
-Critical jobs number of late jobs -Minimize total inventory &
-Construction/building -Single machine, parallel setup costs
industry, ERP machines, flow shop -Process industry
implementation - Customized industrial
hardware, hospitals

Statistic data:
 Processing time (pij) = represents the time job j has to spend on machine i
 Release date (rj) = the time the job arrives at the system i.e. the earliest time at
which job j can start its processing
 Due date (dj) = represents the committed shipping or completion date
 Weight (wj) = priority factor, reflecting the importance of job j in the system for one
time unit


3

Libro relacionado
 image
Michael L. Pinedo, Michael L. Pinedo Planning and Scheduling in Manufacturing and Services
Editorial: Desconocido ISBN: 9781489985590 Edición: Desconocido

Información del documento

Estudio
Subido en
8 de mayo de 2023
Número de páginas
27
Escrito en
2022/2023
Tipo
Notas de lectura
Profesor(es)
J. kabout
Contiene
Todas las clases
$5.16

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Vendido
6
Seguidores
5
Artículos
31
Última venta
1 año hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes