100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

WGU C215 Operations Management PVDC Final Exam Solved 100%

Puntuación
-
Vendido
-
Páginas
17
Grado
A+
Subido en
08-05-2023
Escrito en
2022/2023

Which definition is used for quality, evaluates how well a product performs its intended function? - Answer Fitness for use 14 points for quality improvement - Answer Which total quality management (TQM) process was developed to stress management's responsibility for quality? ISO 9000 - Answer Set of international standards on quality management and quality assurance, critical to international business -TQM process consists of 13 published standards and guidelines -Like when joint commission shows up at the hospitals Checklist - Answer A list of common defects and the number of observed occurrences of these defects. scatter diagram - Answer a plot of two variables showing whether they are related Control Chart - Answer A graph that shows whether a sample of data falls within the common or normal range of variation. mean - Answer A statistical measure of central tendency, or average, based on dividing a total by the number of individual cases. assignable causes of variation - Answer -Causes can be identified and eliminated -e.g. poor employee training, worn tool, machine needing repair common causes or random - Answer Stuff you cannot identify -Random causes that we cannot identify, unavoidable Cpk measures - Answer How close one is to a target and how consistent one is with the average performance. -How closely it measures Six Sigma - Answer Technical tolls and people involvement The empirical rule, 3 standard deviations. This is 3 sigma's. 6 sigmas and you are almost at 100% DMAIC DMAIC (Define, Measure, Analyze, Improve, Control) - Answer a six sigma process that outlines the steps that should be followed to improve an existing business process define stage - Answer includes the voice of the customer and value stream Job Design - Answer It does not have anything to do with people. -The process by which managers decide how to divide tasks into specific jobs waiting time - Answer -Screen patients and fast track those with minor ailments -amount of time a process has been waiting in the ready queue Service location decisions - Answer -proximity to customers -Quality of life issues proximity to customers - Answer -key factor of a location analysis for a service company -if you need to have a car repaired, you wont drive too far. Capacity Planning - Answer Hospital- Capacity is beds and output is the patients. If you have 1 pt for 2 days and one for 3 days. The output is how many patients and not how many beds we have. capacity utilization - Answer are you using more workers and what are your resources? Measures how much of the available capacity is actually being used. Measures effectiveness. Capacity Focus - Answer facilities that are small, specialized, and focused on a narrow set of objectives. effective capacity - Answer capacity measurement at the best operating level - Answer when the average unit cost is minimized center of gravity approach - Answer an approach for locating a single facility that minimizes the distance to existing facilities. -use the breakeven analysis -how many units needed to manufacture to breakeven. break-even analysis - Answer the process of determining the number of units a firm must sell to cover all costs. Considers fixed costs, variable Fed EX is in Tennessee so it will be in the middle repetitive process - Answer classic assembly line. A line process, a continuous process. Project Process - Answer make a one-at-a-time product exactly to customer specifications, expensive. Like an automobile collision shop that does body and engine repair as well as custom vehicle paint job. Batch Process - Answer a process in which goods or services are produced in groups (batches) and not in a continuous stream eg. auto shop offers body repair, engine repair, and custom vehicle paint options Bottleneck in a flowchart - Answer the longest part in the process eg manufacturing a car and the car needs to be painted or the time the cake in the oven. compute process velocity - Answer Throughput time/value-added time -How fast we are going Actual output/standard output - Answer Which formula would indicate that a fast-food restaurant was performing at, above, or below its benchmark? -We know how many burgers were making and what the standard is output/input - Answer productivity formula Throughput time/value-added time - Answer How long it takes from the raw materials to become finished goods. Process - Answer Each item goes through process Which total quality management (TQM) process was developed to stress management's responsibility for quality? - Answer 14 points for quality improvement Hybrid - Answer any mix of elements from a product layout and a process layout, to gain the advantages of both eg group technology standard time - Answer Determines how long it takes a qualified operator to perform a duty of the job requirements under the assumption that the operator is working at a sustainable pace with the proper tools for the process. -How long t takes somebody to finish the work performance time - Answer How long it actually took observed time - Answer Actual time -The time measured from stopwatch infinite loading - Answer A scheduling approach that ignores capacity constraints. -Working backwards -ex Amazon doesn't have the computer you want but they have a network where they can send you to someone who can give it to you finite loading - Answer -Working forward. -Jobs are assigned to work centers taking into account the work center capacity and job processing times. -Have fixed capacity -ex I go to a bike shop to buy a bike. They know what people will want. They offer repair, the can say I need this employee for repair shop. They have resources to manage Backwards Scheduling - Answer Begins with required delivery date and works in the reverse order to determine when each process step must be preformed. Respect for people - Answer A 3rd element element of JIT that considers human resources as an essential part of the JIT philosophy. Reducing waste is achieved - Answer by Just in time and lean system Lean Systems - Answer systems that maximize productivity by reducing waste and delays. Not sacrificing productivity -JIT is a part of lean system - Kanban System - Answer a pull system that uses cards to visually signal the need for inventory. -Exact quantity that needs to be produced -small lot and shorten manufacturing lead time -forecast how much inventory your going to need

Mostrar más Leer menos
Institución
WGU C215
Grado
WGU C215










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
WGU C215
Grado
WGU C215

Información del documento

Subido en
8 de mayo de 2023
Número de páginas
17
Escrito en
2022/2023
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$10.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Exampool NURSING
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
219
Miembro desde
2 año
Número de seguidores
147
Documentos
3592
Última venta
2 semanas hace
Power-horse Library

HELLO Dear ones On this Account you will find all Study related Materials ,EXAMS, STUDY GUIDES, CASES,NOTEBOOKS and many more. well come as we study for Excellency.

3.9

32 reseñas

5
16
4
2
3
10
2
2
1
2

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes