CQE Sample Exam – ASQ with 100% Correct Solutions
CQE Sample Exam – ASQ with 100% Correct Solutions A correlation table yields results similar to those of a (A) check sheet (B) control chart (C) Pareto diagram (D) scatter diagram - CORRECT ANSWER Correct Answer: D Which of the following is a typical obstacle to design review? (A) Customer requirements (B) Manufacturing requirements (C) Resistance from the design department (D) Safety regulations - CORRECT ANSWER Correct Answer: C Implementing a preventive quality system will increase which of the following? (A) Failure costs (B) Inspection time (C) Quality system effectiveness (D) Corrective action effectiveness - CORRECT ANSWER Correct Answer: C Which of the following inspection methods can be used to detect surface flaws but not subsurface flaws? (A) Liquid penetrant (B) Ultrasonic (C) Radiographic (D) Magnetic particle - CORRECT ANSWER Correct Answer: A Which of the following is a barrier to the successful performance of a quality team? (A) Rating the performance of each team member (B) Including people with abilities in different areas (C) Including people from different departments (D) Having the team make decisions without management nt approval - CORRECT ANSWER Correct Answer: A
Escuela, estudio y materia
- Institución
- Liberty University
- Grado
- CQE
Información del documento
- Subido en
- 22 de abril de 2023
- Número de páginas
- 14
- Escrito en
- 2022/2023
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
which of the fo
-
cqe sample exam – asq with 100 correct solutions
-
a correlation table yields results similar to those of a a check sheet b control chart c pareto diagram d scatter diagram
Documento también disponible en un lote