Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Examen

MAN 6925 Project Management - Edith Cowan University._ PROJECT MANAGEMENT PLAN INFORMATION SYSTEMS

Puntuación
-
Vendido
-
Páginas
21
Grado
A+
Subido en
11-04-2023
Escrito en
2022/2023

MAN 6925 Project Management - Edith Cowan University. PROJECT MANAGEMENT MAN 6925 Project Management - Edith Cowan University. PLAN INFORMATION SYSTEMS Table of Contents Introduction ....2 Project Background ...2 Purpose of the Report 2 Scope Management Plan ....2 Project Stakeholders ..2 Problem Statement 2 Project Goals & Objectives .3 Project Deliverables ...3 Technical Requirements ..3 Project Milestones 4 Project Limitations & Constraints .4 Project Acceptance Criteria .4 Project Methodology – Agile Management .4 Project Work Breakdown Structure (WBS) .5 Project Scheduling & Network 5 Gantt chart ..8 Project Costing: Cost Management Plan 9 Project Resourcing ..10 Communication Management Plan ..12 Communication & Meeting Guidelines .12 Mediums ...13 Ethical & Professional Codes .13 Stakeholder Management Plan ...13 Stakeholder Analysis ....13 Stakeholder Engagement ...14 Procurement Plan ...15 Procurement Requirements 15 Solicitation Planning 16 Risk Management Plan 18 References ....20 Introduction Project Background The project is an information system that needs to be designed, developed, and deployed during the project timeframe. The information system can be developed in any of the programming language and it will be required to procure a server and twenty five PCs to run the information system. It is required to configure the PCs with Windows 10 Operating System and to add them to the existing network. The software needs to be developed by the sub-contractors and the server is required to be set up and tested. Purpose of the Report The primary purpose of creating the report is to develop a project management plan for the information system. The report focuses upon the project scope, project costs, project schedule, communication, and project stakeholders. Scope Management Plan Project Stakeholders The key stakeholders of the project are: • Project Sponsor: The organization for which the information system is being developed will be the primary stakeholder of the project. • Project Subcontractors: The stakeholder group will be the project team that will be carrying out the task of design, development, and deployment of the system. • Supplier Groups: Server, twenty five PCs, and other tools will be supplied by the stakeholders (Atkinson, Crawford & Ward, 2006). • End-User: The end system users will provide their feedback on the system. • Project Steering Committee: The stakeholder will provide approvals and will act as the mediator between the sponsor and subcontractors. Problem Statement The information system that is being developed will allow the organization to get rid of the existing issues of data mismanagement, data duplication, slower processing speed, and manual errors. Project Goals & Objectives The goals and the objectives of the project are: • To develop the information system in the programming language determined without any defects in the final release. • To adhere to the functional and non-functional requirements during the system design and development phases. • To maintain the project schedule as per the estimations without any schedule variance at any stage. • To maintain the project budget as per the estimations without any cost variance at any stage (Wearne, 2014). Project Deliverables The main deliverables in the project will be: • Project Brief: It will be a document covering a brief of the information system requirements, project budget, resources, and schedule. • Project Plan: A detailed description of the project scope, methodology, costs, schedule, stakeholders, resources, communication, and procurement. • System Design: The wireframes and UI aspects will be covered in the system design document. • Source Code: The source code will be developed in the programming language determined by the senior management and technical experts. • Defect Report: The defect report will include the details of the bugs identified in the testing phase. • Completion/Closure Report: It will be the final deliverable of the project. Technical Requirements • Server: The information system will be deployed on the server. • PCs: There will be 25 PCs required to deploy the system. • NoSQL Database: The NoSQL database that will be used and implemented in the system will be MongoDB. • Development Tools: Microsoft Visual Studio • Testing Tools: Bugzilla, TestLink • Design Tools: Microsoft Visio, Sketch • Project Management Tools: Microsoft Projec

Mostrar más Leer menos
Institución
MAN 6925 Project Management
Grado
MAN 6925 Project Management










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
MAN 6925 Project Management
Grado
MAN 6925 Project Management

Información del documento

Subido en
11 de abril de 2023
Número de páginas
21
Escrito en
2022/2023
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

$12.49
Accede al documento completo:

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
AllAcademic Other
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
67
Miembro desde
6 año
Número de seguidores
39
Documentos
548
Última venta
1 mes hace
All the academic resources you need.

All the academic resources you need.

3.7

7 reseñas

5
3
4
1
3
2
2
0
1
1

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes