questions with correct answers
The portion of total risk that remains after unacceptable risk has been determined is ________. - correct answer Residual
An opposing force, condition, source, or circumstance with the potential to negatively impact your mission and/or degrade the mission capability is a __________. - correct answer Hazard
Risk to forces is the risk that could potentially damage or injure our forces (equipment and personnel). - correct answer True
Individual units may keep files of their own tailored TRACS Assessments in a secure place other
than on the TRACS website. - correct answer True
__________ is the estimate of the likelihood that a hazard will cause an impact on an operation. -
correct answer Probability
Residual risk is the risk remaining after controls have been identified, selected, and implemented for the hazard. - correct answer True
TRACS stands for _________. - correct answer Total Risk Assessment and Control System
PPE falls into the category of _________ controls. - correct answer Physical
Supervisors need only concern themselves with attaining good ORM communication with their subordinates, not what comes down from the upper chain-of-command. - correct answer False