CSU CON 101 EXAM 1 WITH 100% CORRECT ANSWERS
Six Dials of Project Scope -cost -time -quality -safety -scope -function Three-legged-stool -time -cost -quality Design-bid-build Traditional project delivery method -owner holds two separate contracts for design and build Agency CM Cons. Manager acts on the owners best interest but is not financially responsible GMP Guaranteed Maximum Price Multiple Prime Contracting method where the owner bypasses a General Contractor and enters into multiple contracts with contractors Design-build Newer delivery method where there is only 1 contract between the owner and Design/Builder. Design/Builder is responsible for both ends. Fast-tracking a practice utilized to speed up job by overlapping the design and construction phrase. IPD Integrated Project Delivery In what time period was the concept of a Theoretical Architect developed? The Renaissance When was concrete first used? During the Roman Empire What is an individual responsible for the design, engineering, and construction of a project? Master builder How is the Code of Hammurabi important to construction? First known recorded building code. What were some of the changes in building materials that contributed to growth of the building industry in the late 1880's? Steel framing replaced iron framing, invention of Portland Cement and reinforcing, mass production of glass, and the invention of the passenger elevator. What is horizontal construction? Heavy Civil Construction Which sector of the construction industry requires the broadest range of knowledge for a contractor to be successful? Residential
Información del documento
- Subido en
- 3 de abril de 2023
- Número de páginas
- 7
- Escrito en
- 2022/2023
- Tipo
- Examen
- Contiene
- Preguntas y respuestas