LOG 104 MODULE 3 EXAM questions with correct answers
Which methods are used to convert operational RAM requirements into contractual RAM requirements? (Select the five alternatives that apply.) CORRECT ANSWER 1.**** Apply a formal translator. 2.**** Apply a systems engineering approach. 3.*** Apply a policy. 4.**** Apply cost, schedule, or other constraints 5.***** Ask industry what is the best that can be done. Why might field reliability data differ from contractual reliability data? (Select the three alternatives that apply.) CORRECT ANSWER 1.**** The user changes the mission. 2. **** Field removals that were counted as failures are later determined to have no-defects. 3.*** Failures can be caused by interacting components and have been incorrectly classified as failures, rather than removals. What is a common reason why Mean Time Between Failure (MTBF) and Mean Time Between Maintenance (MTBM) are confused by both program offices and users in the field? CORRECT ANSWER Lack of understanding of the meaning of the term. Which of the following is an example of a nondevelopmental item? CORRECT ANSWER Item developed for and in-use by the government.
Escuela, estudio y materia
- Institución
- LOG 104
- Grado
- LOG 104
Información del documento
- Subido en
- 28 de febrero de 2023
- Número de páginas
- 2
- Escrito en
- 2022/2023
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
which methods are used to convert operational ram requirements into contractual ram requirements select the five alternatives that apply correct answer 1 apply a formal translator
Documento también disponible en un lote