SAFe Agile Scrum Master Study Guide (Answered) Verified Solution
SAFe Agile Scrum Master Study Guide (Answered) Verified Solution ART Agile Release Train PO Project Owner PI Program Increment Innovation and Planning Iteration Occurs every PI and serves multiple purposes. It acts as an estimating buffer for meeting PI objectives, as well as providing dedicated time for innovation, continuing education, and PI planning and Inspect and Adapt (I&A) events. Inspect & Adapt (I&A) A significant event, held at the end of each PI, where the current state of the solution is demonstrated and evaluated by the train. Teams reflect and identify improvement backlog items via a structured, problem-solving workshop Iteration A basic building block of Agile development. Each is a standard, fixed-length timebox, where Agile Teams deliver incremental value in the form of working, tested software and systems. What is the recommended timebox duration for an Iteration? 2 weeks; however, 1-4 weeks is acceptable, depending on the business context.
Escuela, estudio y materia
- Institución
- SAFe Agile Scrum Master
- Grado
- SAFe Agile Scrum Master
Información del documento
- Subido en
- 4 de febrero de 2023
- Número de páginas
- 7
- Escrito en
- 2022/2023
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
safe agile scrum master study guide answered verified solution art agile release train po project owner pi program increment innovation and planning iteration occurs every pi and serves multiple pu
Documento también disponible en un lote