CQE - Sample Exam - ASQ | Questions with 100% Correct Answers | Updated & Verified | 20 Pages
What are the major disadvantages of having an improvement team that is too large? I Difficulty in having constructive input from the entire group. II Difficulty in arriving at consensus. III Difficulty in finding large meeting facilities. IV Difficulty, on the part of the recorder, in keeping up with more paperwork. A. I only B. I & II only C. I, II & III only D. I, II, III & IV - B. I & II only Which of the following is NOT considered a prevention cost? A. Writing operating procedures. B. Training. C. Data acquisition and analysis. D. Calibrating test equipment. - D. Calibrating test equipment. An improvement in quality costs is MOST clearly indicated when: A. Appraisal and failure costs drop. B. Prevention costs increase. C. Total quality costs fall below 15% of total sales. D. Management objectives are met. - D. Management objectives are met. During the building phase of improvement team development, which of the following properly describes team activities?
Escuela, estudio y materia
- Institución
- CQE - ASQ
- Grado
- CQE - ASQ
Información del documento
- Subido en
- 12 de noviembre de 2022
- Número de páginas
- 20
- Escrito en
- 2022/2023
- Tipo
- Examen
- Contiene
- Preguntas y respuestas
Temas
-
cqe sample exam asq | questions with 100 correct answers | updated amp verified | 20 pages
Documento también disponible en un lote