Summary OBS220 Notes Covering Ch 7,8,11,14 PM (2022 Semester Test 2)

Puntuación
-
Vendido
-
Páginas
28
Subido en
05-10-2022
Escrito en
2022/2023

Theses are detailed notes covering chapters 7,8,11, and 14 from the Project Management textbook. These notes have been compiled in conjunction with the textbook and lecture slides. These notes have also been made for semester test 2 of 2022. Textbook used: Project management: Kloppenborg, T.J., Anantatmula, V., Wells, K. N. (2017) Contemporary Project Management. 4 th Ed. Cengage: Boston Please note: I am only selling the notes/summaries made from the above mentioned textbook and am not selling the intellectual property provided.

Mostrar más Leer menos
Institución
Grado










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Institución
Grado

Información del documento

¿Un libro?
No
¿Qué capítulos están resumidos?
7, 8, 11, 14
Subido en
5 de octubre de 2022
Número de páginas
28
Escrito en
2022/2023
Tipo
Resumen

Temas

Vista previa del contenido

CHAPTER 7: Scope Planning


(1.1.)Scope Planning Process
(1) Plan Scope Management
(2) Collect project requirements
(3) Define project scope
(4) Create work breakdown structure (WBS)
(5) Establish change control




Flow of Scope Planning
Plan Scope Management
Plan Scope Management: the process of developing a plan that includes the total scope of what needs to be
done and what is excluded from the project; implementation and validation of the scope; and how to control
deviations from the scope statement.


Total Scope = Product Scope + Project Scope



Product Scope: outputs the team will deliver to its customers
Project Scope: The work needed to be performed in order to deliver the projects outputs

(1.2.)Collect Requirements
Make sure the project team is absolutely clear on the project objectives.

Collect Requirements: a systematic effort to understand and analyse stakeholder needs to define and
document these needs and requirements with a focus on meeting project objectives.

(1.2.1.)Gather Stakeholder Input & Needs
Use voice of the customer techniques (VOC)
▪ Ask questions
▪ Place yourself in the customer’s situation
▪ State customer desires in operational terms

,Collecting requirements is same regardless of type of project. Generally Agile documentation is less formal,
thus allowing for progressive elaboration
Common methods for obtaining & documenting requirements:
▪ Meetings with Stakeholders
▪ Interviews
▪ Focus Groups
▪ Questionnaires
▪ Surveys
▪ Observations
▪ Prototypes
▪ Industry Standards
▪ Reference Documents
▪ Market Analysis
▪ Competitive Analysis
▪ Client Requests
▪ Standard Specifications


Seek a high-level description:

What do we not understand about the feature?
What is the business reason for the feature?
What is the impact of not providing this feature?
What action items need to be accomplished if we do this?
What impact will this have on other features of the project or elsewhere?



Requirements Traceability Matrix

, (1.3.)Define Scope
Define Scope: the process of translation stakeholder needs and requirements into detailed specifications of
the project outcomes & products.

Reasons to Define Scope ▪ All other planning is based on the project scope
▪ Needed to preventing scope creep
How to Define Scope (1) List project deliverables (Determine
acceptance criteria)
(2) Establish project boundaries
a. In scope vs. Out of scope
b. Understand constraints
(3) Create a Scope Definition

Defining Scope in Agile ▪ At beginning of project, overall scope only identified at high level
Projects ▪ Backlog of possible work identified also
▪ Use smaller, frequent iterations to get feedback, as customer desires evolve
over time
▪ Customer representative (“owner”) prioritizes scope based on business need,
value, cost, & risk.




(1.4.)WORK BREAKDOWN STRUCTURE (WBS)

WBS: Tool to progressively divide project deliverables into smaller pieces. It Identifies all deliverables. A
framework for further planning, execution, and control.


Define Activity: a project planning process which identifies and determines specific actions to develop and
deliver the project outcomes, such as products, services or results


(1.4.1)Purpose of WBS:
▪ Ensures all parts of project are considered
▪ Adds discipline and visibility to project planning
▪ Basis for planning schedule, resources, cost, quality, & risk
▪ Useful in determining where and why problems occur
▪ Helpful in project communications
$4.88
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
nichav University of Pretoria
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
47
Miembro desde
4 año
Número de seguidores
33
Documentos
0
Última venta
9 meses hace

3.7

6 reseñas

5
2
4
2
3
1
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes