Unit 9:IT Project Management - Assignment 2 (All Criterias Met) | Distinction Grade

Puntuación
-
Vendido
-
Páginas
32
Grado
A
Subido en
29-09-2022
Escrito en
2021/2022

This essay/assignment covers Unit 9 - IT project management assignment 2, with all criterias met to achieve the highest grade (Distinction) along with correct structure. Just follow the content step by step to save time and also to reduce complexity. Harvard Referencing Included*. Note: This will support those in achieving distinction in an effortless way where possible. Best of Luck!

Mostrar más Leer menos
Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Nivel de Estudio
Editores
Tema
Curso

Información del documento

Subido en
29 de septiembre de 2022
Número de páginas
32
Escrito en
2021/2022
Tipo
Ensayo
Profesor(es)
Desconocido
Grado
A

Temas

Vista previa del contenido

UNIT 9 – IT PROJECT
MANAGEMENT
ASSIGNMENT 2
[Enter your name or ID]




MAY 20, 2022

,Unit 9 | BTEC L3 Extended Dip IT



Contents
Introduction..........................................................................................................................................2
P3..........................................................................................................................................................2
1. Initial Idea.....................................................................................................................................2
2. Initial Problem to be solved..........................................................................................................2
3. Lifecycle of a project - Which approach will this project employ................................................3
4. Proposal 1 – Construct3 Introduction..........................................................................................3
5. Proposal 2 – Unity – Introduction................................................................................................3
P4 - Feasibility Assessment for Proposal 1 & 2....................................................................................5
M2 – Benefits and Limitations............................................................................................................11
D2 – Evaluation...................................................................................................................................14
P5........................................................................................................................................................16
Agile Methodology.........................................................................................................................16
Identify Your Stakeholders.............................................................................................................17
Project Phases with the Agile Methodology..................................................................................17
Smaller Functional Requirements..................................................................................................18
Smaller Non-Functional Requirements..........................................................................................18
Acceptance of Requirements Documentation...............................................................................19
Plan your meetings.........................................................................................................................22
Clearly identify your constraints....................................................................................................22
Create Initial Problem Log..............................................................................................................23
What is Risk Management..............................................................................................................23
My Risk Register.............................................................................................................................24
My Issue Register............................................................................................................................25
P6 & P7...............................................................................................................................................26
Time Management.........................................................................................................................26
Cost Management for the Project Needs.......................................................................................27
Quality Management......................................................................................................................28
Change Management.....................................................................................................................28
Update Your Risk Register..............................................................................................................28
Update Your Issue Register............................................................................................................29
Update Test Plans...........................................................................................................................29
References..........................................................................................................................................31
1|Page

,Unit 9 | BTEC L3 Extended Dip IT


Unit 9 IT Project Management – Assignment 2



Introduction

In this assignment I am going to research, prepare, plan and execute the IT project and also
monitor and control inconsistencies of the IT project. I will suggest proposals and alternatives and
at least two studied and practical solutions to an IT issue on a specific subject will be evaluated
consistently and completely, and a preferred solution will be justified through logical chains of
reasoning.

P3

1. Initial Idea
The project's initial concept is that I have been assigned by a gaming organisation called PUG
Games LTD to investigate, plan, and oversee a project that will match their needs while the game
is being developed or finalised. I've been tasked with creating a computer game that would appeal
to youngsters aged 8 to 12.



2. Initial Problem to be solved
The first problems to be solved are the various limitations, which are supposed to be IT challenges
that the developer encounters when establishing, developing, and performing the game. What
hardware concerns prevented the task from being completed. Although, giving two options on
how they may support and assist the organisation in minimising these issues.



While wearing this hat. You can only think of.

White Hat We were provided a list of facts and
information, as well as a list of difficulties that
the organisation had detected in a short
period of time, in order to revise the project
and bring it to a successful conclusion.
Red Hat As the organisation has a limited number of
personnel and technologies, there may be
several issues that make it difficult to design,
create, and submit the project.
Black Hat Because of defects or corruptions in the
software, the solution was unable to operate.
Yellow Hat The advantages of expressing solutions to
challenges are that it helps to minimise the
many limitations that people and
organisations face when planning, creating,

2|Page

, Unit 9 | BTEC L3 Extended Dip IT

and executing the game.
Green Hat When it comes to finding a creative solution
to an issue, I'd utilise an approach that allows
me to create creative mind maps to show my
customers what various phases of design and
planning I've gone through.
Blue Hat This is where I will go through the many
procedures, I took to fulfil the designated role
or task, as well as check whether the other
team members followed suit to match the
client's expectations.




3. Lifecycle of a project - Which approach will this project employ
The Prince2 approach is one that I believe might be implemented for the project since it would be
a wonderful way to preserve more information about the project and exhibit a complete planning
of the project's needs.
 Timescale & Options for this project
Because we are employing this technique, it is likely that it is a structured method that will
enable us to divide the project into subcategories and have a full perspective of each step.

 Project completion timeframe
The project must be completed in three months, from the start of planning through the
completion and submission of the finished game.



4. Proposal 1 – Construct3 Introduction
Construct3 is a 2D game engine that allows you to develop and construct your own games in a
variety of genres. This gaming engine enables users to utilise computer languages such as
JavaScript to add actions and functions to the many objects and characters in a game scenario. It's
similar to Unity, but it's free to use, which is a plus for those who don't want to pay monthly or for
other subscriptions.



5. Proposal 2 – Unity – Introduction
Unity is yet another new gaming engine whose goal is to create modern and strong games that
pique the audience's attention and likeability. It is a gaming engine that allows you to create
realistic designs in both 2D and 3D games.




3|Page
$15.73
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Elliot75 Uxbridge College (London)
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
55
Miembro desde
4 año
Número de seguidores
49
Documentos
0
Última venta
11 meses hace

4.0

7 reseñas

5
1
4
5
3
1
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes