100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

WGU C215 Study Guide – FINAL Latest Updated 2022 Already Passed

Puntuación
4.0
(6)
Vendido
8
Páginas
25
Grado
A
Subido en
11-09-2022
Escrito en
2022/2023

WGU C215 Study Guide – FINAL Latest Updated 2022 Already Passed Total Quality Management (TQM) Philosophy 1. customer focus 2. continuous improvement 3. employee empowerment 4. use of quality tools 5. product design 6. process management 7. managing supplier quality Process Capability Index (Cpk) Basic function of Six Sigma. Measures the process potential and performance of processes. The higher the range of Cpk, the improved is the ability of the process to complete its necessities. Six Sigma A disciplined, data-driven approach and methodology for eliminating defects (driving toward six standard deviations between the mean and the nearest specification limit) in any process - from manufacturing to transactional and from product to service. Design Capacity The theoretical maximum output of a system in a given period under ideal conditions. Location Analysis proximity to customers, transportation, source of labor, community attitude, proximity to suppliers, and many other factors. The technique for determining location decisions. Line Processes A type of process used to produce a large volume of a standardized product. ■ Limited customization and high volume Batch Processes A type of process used to produce a small number of products in groups or batches based on customer orders or specifications. ■ High customization moderate volume Project Processes A type of process used to make a one-at-a-time product exactly to customer specifications. ■ Most custom and lowest volume Continuous Processes A type of process that operates continually to produce a high volume of a fully standardized product. - No customization and as high a volume as possible Bottleneck Longest task in the process. Flexible Manufacturing System (FMS) A type of automated system that combines the flexibility of intermittent operations with the efficiency of continuous operations. Output/Input Control A technique for monitoring the flow of jobs between work centers. Value-Added The net increase created during the transformation of inputs into final outputs. Hybrid Layouts Layouts that combine characteristics of process and product layouts. - Group technology layouts. - Cell technology layouts. - Grocery stores use hybrid layouts Relationship Chart (REL) Table that reflects opinions of managers with regard to the importance of having any two departments close together. Rectilinear Distance The shortest distance between two locations using north-south and east-west movements. From-To Matrix Table that gives the number of trips or units of product moved between any pair of departments. Block Plan Schematic showing the placement of resources in a facility. Mean Observed Times The average of the observation times for each of the work elements. Normal Time The mean observed time multiplied by the performance rating factor by the frequency of occurrence. Standard Time The length of time it should take a qualified worker using appropriate process and tools to complete a specific job, allowing time for personal fatigue and unavoidable delays. Just-in-Time (JIT) A philosophy designed to achieve high-volume production through elimination of waste and continuous improvement. Based on a "pull" system rather than a "push" system. The three elements are just-in-time manufacturing, total quality management, and respect for people. Kanban card A card that specifies the exact quantity of product that needs to be produced. Tier One Suppliers Supplies materials or services directly to the processing facility. These are the suppliers that put products in specific containers or packages. Internal Functions companies Tier Two Suppliers Directly supplies materials or services to a tier-one supplier in the supply chain. Suppliers of the specialty materials for the tier one suppliers to be able to produce the packaging necessary for different products. Think cardboard, plastic, glass, chemicals. Tier Three Suppliers Directly supplies materials or services to a tier two supplier in the supply chain. These are companies that extract raw materials. Oil, raw chemical materials, wood. Capacity Requirements Planning (CRP) Determines the labor and machine resources needed to fill the open and planned orders generated by the MRP. Basically, checking if there is enough work scheduled for operations Enterprise Resource Planning (ERP) Large software programs used for planning and coordinating all resources throughout the entire enterprise. Aggregate Plans - IN A BROAD SENSE Includes the budgeted levels of finished products, inventory, backlogs, workforce size, and aggregate production rate needed to support the marketing plan. Marketing Plan, TO, Operating and engineering Plans, TO, Start or revision of the strategic business plan. Third-Party Logistics (3PL) Businesses used to outsource elements of the company's distribution and fulfillment services. They typically specialize in integrated operation, warehousing and transportation services which can be scaled and customized to customers' needs based on market conditions, such as the demands and delivery service requirements for their products and materials. Supply Chain Operations Reference model (SCOR) the world's leading supply chain framework, linking business processes, performance metrics, practices and people skills into a unified structure. The goals are to increase the speed of system implementations, support organizational learning goals, and improve inventory turns. Project Life Cycle Phases Conception, Feasibility/Study analysis, Planning, Execution, Termination Master Production Schedule (MPS) A plan for individual commodities to be produced in each time period.It is usually linked to manufacturing where the plan indicates when and how much of each product will be demanded. It gives production, planning, purchasing

Mostrar más Leer menos
Institución
WGU C215
Grado
WGU C215










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
WGU C215
Grado
WGU C215

Información del documento

Subido en
11 de septiembre de 2022
Número de páginas
25
Escrito en
2022/2023
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

WGU C215 Study Guide – FINAL Latest Updated 2022 Already Passed Total Quality Management (TQM) Philosophy ✔✔1. customer focus 2. continuous improvement 3. employee empowerment 4. use of quality tools 5. product design 6. process management 7. managing supplier quality Process Capability Index (Cpk) ✔✔Basic function of Six Sigma. Measures the process potential and performance of processes. The higher the range of Cpk, the improved is the ability of the process to complete its necessities. Six Sigma ✔✔A disciplined, data -driven approach and methodology for eliminating defects (driving toward six standard deviations between the mean and the nearest specification limit) in any process - from manufacturing to transactional and from product to se rvice. Design Capacity ✔✔The theoretical maximum output of a system in a given period under ideal conditions. Location Analysis ✔✔proximity to customers, transportation, source of labor, community attitude, proximity to suppliers, and many other factors. The technique for determining location decisions. Line Processes ✔✔A type of process used to produce a large volume of a standardized product. ■ Limited customization and high volume Batch Processes ✔✔A type of process used to produce a small number o f products in groups or batches based on customer orders or specifications. ■ High customization moderate volume Project Processes ✔✔A type of process used to make a one -at-a-time product exactly to customer specifications. ■ Most custom and lowest volu me Continuous Processes ✔✔A type of process that operates continually to produce a high volume of a fully standardized product. - No customization and as high a volume as possible Bottleneck ✔✔Longest task in the process. Flexible Manufacturing System (FMS) ✔✔A type of automated system that combines the flexibility of intermittent operations with the efficiency of continuous operations . Output/Input Control ✔✔A technique for monitoring the flow of jobs between work centers . Value -Added ✔✔The net increase created during the transformation of inputs into final outputs. Hybrid Layouts ✔✔Layouts that combine characteristics of process and product layouts. - Group technology layouts. - Cell technology layouts. - Grocery store s use hybrid layouts Relationship Chart (REL) ✔✔Table that reflects opinions of managers with regard to the importance of having any two departments close together. Rectilinear Distance ✔✔The shortest distance between two locations using north -south and east-
west movements. From -To Matrix ✔✔Table that gives the number of trips or units of product moved between any pair of departments. Block Plan ✔✔Schematic showing the placement of resources in a facility. Mean Observed Times ✔✔The average of the obser vation times for each of the work elements . Normal Time ✔✔The mean observed time multiplied by the performance rating factor by the frequency of occurrence. Standard Time ✔✔The length of time it should take a qualified worker using appropriate process and tools to complete a specific job, allowing time for personal fatigue and unavoidable delays. Just-in-Time (JIT) ✔✔A philosophy designed to achieve high -volume production through elimination of waste and continuous improvement. Based on a "pull" system rather than a "push" system. The three elements are just -in-time manufacturing, total quality management, and respect for people. Kanban card ✔✔A card that spe cifies the exact quantity of product that needs to be produced. Tier One Suppliers ✔✔Supplies materials or services directly to the processing facility.
$9.49
Accede al documento completo:
Comprado por 8 estudiantes

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Reseñas de compradores verificados

Se muestran los 6 comentarios
1 año hace

1 año hace

1 año hace

2 año hace

2 año hace

3 año hace

4.0

6 reseñas

5
3
4
0
3
3
2
0
1
0
Reseñas confiables sobre Stuvia

Todas las reseñas las realizan usuarios reales de Stuvia después de compras verificadas.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
BrilliantScores Chamberlain College Of Nursng
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
2819
Miembro desde
3 año
Número de seguidores
2233
Documentos
16100
Última venta
4 días hace
latest updated documents, correct, verified & graded A study materials

get bundles, documents, test banks, case studies, shadow health's, ATIs, HESIs, study guides, summary, assignments & every kind of study materials.

3.8

774 reseñas

5
388
4
117
3
116
2
37
1
116

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes