100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Resumen

Summary Business Management (OBS220) semester test 2

Puntuación
-
Vendido
-
Páginas
22
Subido en
06-09-2022
Escrito en
2022/2023

summary of ch7,8,11,14

Institución
Grado










Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
6 de septiembre de 2022
Número de páginas
22
Escrito en
2022/2023
Tipo
Resumen

Temas

Vista previa del contenido

OBS 220
Chapter 7: Scope Planning
Scope planning process:




1. Plan scope management
 Plan scope management- process of developing a plan that includes
the total scope of what needs to be done and what is excluded from the
project, implementation and validation of the scope, and control
deviations from the scope statement
 TOTAL SCOPE= PRODUCT SCOPE + PROJECT SCOPE
 Product scope- outputs the team will deliver to its customers
 Project scope- work needed to be performed in order to deliver the
project’s outputs
 Exclusions, constraints, and assumptions- anything that will limit or
influence the project work

2. Collect project requirements
 Requirement- condition or capability needed by a user to solve a
problem or achieve an objective that satisfies a standard, a
specification, or any other formally documented need.
Functional/technical- focus on the needs assessment exercises and on
the performance of the deliverable. Non-functional requirements
include requirements such as scalability, reliability, maintainability, and
testability. Once captured, these customer wants and needs are then
stated in operational terms that the people performing the project work
can use to plan that work.
 Collect requirements- systematic effort to understand and analyse
stakeholder needs to define and document these needs and
requirements with a focus on meeting project objectives
 Ensure that the project team is clear on the project objectives
 Accomplished by reviewing project charter
 Project team members describe expected project benefits and
what problems the project is attempting to overcome
 Complex projects; project manager may choose to use idea
generation, grouping, and/or cause-and-effect techniques,
making sure everyone knows why project is conducted
 Understanding broad project objectives is especially useful with
multifunctional, virtual, and global project teams
 Gather stakeholder input and needs



Megan Meiring

,  traditional methods of obtaining and documenting requirements:
meetings with key stakeholders, interviews, focus groups,
questionnaires, surveys, observations, prototypes, industry
standards
 new project development projects; VOC (voice of the customer)-
elicit the benefits and features the customers want out of the
project expressed in the customer’s language. Understand the
customer by not only asking questions but also by placing
themselves in the customer’s situation.
 When requirements are complete, each requirement needs to be:
a. Traceable back to the business reason for it
b. Identified with the stakeholder(s) who need it
c. Unambiguous
d. Qualified by measurable conditions
e. Validated for its value and completion
f. Bounded by constraints
g. Prioritized according to value, cost, time risk, or mandate so trade-off
decisions can be made if needed
 Once these requirements are developed, they are translated into
specifications:




3. Define project scope
 Scope- process of translating stakeholder needs and requirements into
detailed specifications of the project outcomes and products
 Reasons to define scope: all other planning is based on the project
scope. definition also is vital in preventing scope creep
 Scope creep happens: if the scope is not clearly defined and agreed
upon, it is easy to add additional work to the project without realizing
that more time and resources will be required, and when the project is
going well and as planned and so the customer asks for additional
project outputs
 Define scope:
1. List deliverables and acceptance criteria
2. Establish project boundaries – The first part of the boundary
definition is to decide which features and work elements are
included and which are excluded. The second part is to manage
expectations with regards to the project.


Megan Meiring

, 3. Create a scope description – This description briefly states the work
that needs to be accomplished to create the project deliverables.
 Scope in Agile projects- Agile scope definition is a complex process as
the scope is not clear to either the project team or the client. The
project manager and the project team must demonstrate greater
adaptability to frequently changing scope and employ iterative or
phased planning of scope. Agile projects are more flexible. The Agile
method for defining scope is primarily applicable when the project
scope is unclear or poorly defined.

4. Create Work Breakdown Structure (WBS)
 WBS- uniform, consistent, and logical method for dividing the project
into small, manageable components to manage project scope and for
planning, estimating, and monitoring. Normally developed by listing
deliverables.
 Activity- project planning process that identifies and determines specific
actions to develop and deliver the project outcomes, such as products,
services, or results
 WBS formats:




 Levels:
(1) first level – overall project
(2) second level – major deliverables
(3) intermediate level – interim deliverables (items that need to be
created to produce the final deliverables such as drafts, prototypes,
and designs)
(4) summary level – any level that has at least one level below it
(5) lowest level – work package




Megan Meiring
$8.55
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
MeganMeiring

Conoce al vendedor

Seller avatar
MeganMeiring University of Pretoria
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
6
Miembro desde
3 año
Número de seguidores
4
Documentos
26
Última venta
10 meses hace
HR / IOP

BCom HR BCom Honours IOP MCom IOP

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes