100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Oregon Construction Contractors CCB Test 2022 (verified answers)

Puntuación
5.0
(3)
Vendido
7
Páginas
57
Grado
A+
Subido en
26-08-2022
Escrito en
2022/2023

Oregon Construction Contractors CCB Test 2022 (verified answers)

Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Grado

Información del documento

Subido en
26 de agosto de 2022
Número de páginas
57
Escrito en
2022/2023
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Oregon Construction Contractors CCB
Test 2022 (verified answers)

A person who engages in a business or activity that involves construction new water
wells must possess a license from the: ANS:- Oregon Water Resource Department
(OWRD)


True or False
Prompt billing and prompt collections make for a healthier cash flow. ANS:- True


Oregon OSHA consultants WILL NOT: ANS:- Issue citations or propose penalties for
violations of OSHA standards.


1) Questions to answer when preparing your project schedule include all of these
except:


- All of these are questions to ask
- What equipment will be needed?
- How long will each task take to complete?
- What type of crew will be needed to complete the activity? ANS:- - All of these are
questions to ask
- What equipment will be needed?
- How long will each task take to complete?
- What type of crew will be needed to complete the activity?


For Notice of Right Lien purpose, a commercial improvement is defined as: ANS:- A
structure that is not used or intended for use as a residential building


I am the residential original contractor and I provide labor and materials for the
project. Who do I need to give a notice of Right to Lien to? ANS:- Mortgagee

,A quantity survey is also referred to as a: ANS:- Take Off


Tagout involves placing a warning tag: ANS:- On an energy-isolation device


Other than Take Off, other common construction estimate types include all, except:
ANS:- Ballpark Estimates


True or False
An on-site of host employer is responsible for ensuring a safe place of employment
for leased or temporary workers. ANS:- True


The state unemployment tax rate varies base on: ANS:- The history of
unemployment claims against the employer.


Stop work order violations can result in: ANS:- - Any of these could be the result of
failure to comply with a stop work order.
- Court action
- Permit or license revocation
- Civil penalties


The ___________________ gives an overview of the project, deadlines, and general
requirements. ANS:- Invitation to Bid


"Job Logic" refers to: ANS:- The sequence of work


True or False
Self-employment taxes apply to all forms of business entities. ANS:- False


- Money earned and money spent are accounted for in the year they are received or
paid, respectively. ANS:- In the Cash Method


The Itemized Summary is the basis for: ANS:- A complete and accurate estimate of
project costs and lists all major items of work in the order they are to be performed.

,A major difference between the EIN and the BIN is: ANS:- One is federal and one is
state


Poor construction and storage practices can result in _________________ inside the
structure walls. ANS:- Molds and fungus


Builders now must use corrosion-resistance flashing in these specified locations,
except: ANS:- Surrounding all interior bedroom doors.


Compliance with environmental regulations can protect a contractor from:


- All of these are correct
- Private party lawsuits
- Criminal and civil penalties
- Liability claims ANS:- - All of these are correct
- Private party lawsuits
- Criminal and civil penalties
- Liability claims


Using the Quantity Take-Off method for estimating, you begin by estimating the cost
of _________________ for each individual task. ANS:- Labor and materials


Contractors must apply for permits through: ANS:- Their local building department


A cost effective method for managing material costs and keeping inventory costs
down is the: ANS:- JIT - Just In Time


These are materials prohibited form open burning in Oregon except for: ANS:-
Unpainted and untreated scrap wood


An owner-seller may comply with the Homebuyers Protection Act (HPA) by:


- Doing any of these
- Purchasing title insurance that does not exclude filed or unfiled claims of lien,

, - Obtaining lien waivers or releases
- Retaining at least 25% of the sales price in escrow
ANS:- - Doing any of these
- Purchasing title insurance that does not exclude filed or unfiled claims of lien,
- Obtaining lien waivers or releases
- Retaining at least 25% of the sales price in escrow


What are the possible consequences that a contractor may face if he or she fails to
provide the information to the Owner About Construction Liens when required?


- All of these are correct
- Contractor may be fined
- Contractor may lose lien rights
- Contractor may have CCB license suspended
ANS:- - All of these are correct
- Contractor may be fined
- Contractor may lose lien rights
- Contractor may have CCB license suspended


Withheld taxes are considered to be "_____________" funds that do not belong to
the business and cannot be used for any other purpose. ANS:- Trust


The major purpose of the building exterior shell is to: ANS:- Provide protection for
the building at its exterior boundaries and to enclose a suitable interior environment


A project manager can be involved in more than one construction project at the
same time. ANS:- True


The building exterior shell may consist of:


- All of these are part of the building exterior shell
- Only windows and doors
- Only exterior wall assemblies
- Only roof assemblies ANS:- - All of these are part of the building exterior shell
$13.49
Accede al documento completo:
Comprado por 7 estudiantes

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Reseñas de compradores verificados

Se muestran los 3 comentarios
2 año hace

2 año hace

2 año hace

5.0

3 reseñas

5
3
4
0
3
0
2
0
1
0
Reseñas confiables sobre Stuvia

Todas las reseñas las realizan usuarios reales de Stuvia después de compras verificadas.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Welch1 Walden University
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
64
Miembro desde
7 año
Número de seguidores
56
Documentos
459
Última venta
4 meses hace

4.3

9 reseñas

5
5
4
2
3
2
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes