Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 10 páginas
Examen

BCF 130 - MOD 12-14 EXAM. QUESTIONS WITH ANSWERS. 2022

Document preview thumbnail
Vista previa 2 fuera de 10 páginas

BCF 130 - MOD 12-14 EXAM. QUESTIONS WITH ANSWERS. 2022. 1) The life cycle cost estimate need to be compared to the program affordability analysis to ensure it falls within the affordability caps. True False 2) You estimated that a Naval communications research contract will cost $350.0 K (CY16). You plan to award this 12-month contract in 2019. Using inflation indices from the table, what should your budget request be in TY dollars? $372.0 K None of these are correct. $329.3 K $368.4 K 3) Documentation of the steps taken to develop the estimate is necessary so that a cost analyst unfamiliar with the program can recreate it and produce the same result. True False 4) After aggregating all of the individual distributions during a symmetric approximation into a total cost distribution, we have plotted the Cumulative Distribution Function (CDF) (see chart). How much funding would be required for an 80% chance of an overrun (20% chance of an underrun)? 220 $M 160 $M 140 $M 2 1 2 1 171 $M 5) When preparing for a Defense Acquisition Board (DAB) review, there is a timeline established by the OSD Cost Assessment and Program Evaluation (CAPE). How many days prior to OIPT is required for the OSD CA, PMO and SCA to meet and compare and discuss CCP and ICE. 45 days 28 days None of these are correct 10 days 6) Purchases of end items, weapons and equipment greater than $250,000 intended for operational use or inventory are funded from which appropriation? Procurement MILCON RDT&E O&M 7) In this course we base Symmetric Approximation around a five-step process. Step 1 of the process focuses on selecting which of the following (select two): High dollar cost elements Element that are sensitive to changes made Low dollar cost elements Element which have a small range in potential value. 8) If we were purchasing a helicopter for operational use, funding half of the cost of the helicopter in one year`s appropriation and funding the second half of the cost in the next year`s appropriation would be an example of: 1

Vista previa del contenido

1) The life cycle cost estimate need to be compared to the program affordability analysis to
ensure it falls within the affordability caps.
10164704 2

True

False

2) You estimated that a Naval communications research contract will cost $350.0 K (CY16).
You plan to award this 12-month contract in 2019. Using inflation indices from the table, what
should your budget request be in TY dollars?
10166026 1




$372.0 K

None of these are correct.

$329.3 K

$368.4 K

3) Documentation of the steps taken to develop the estimate is necessary so that a cost analyst
unfamiliar with the program can recreate it and produce the same result.
10164682 2

True

False

4) After aggregating all of the individual distributions during a symmetric approximation into a
total cost distribution, we have plotted the Cumulative Distribution Function (CDF) (see chart).
How much funding would be required for an 80% chance of an overrun (20% chance of an
underrun)?
10166018 1




220 $M

160 $M

140 $M

, 171 $M

5) When preparing for a Defense Acquisition Board (DAB) review, there is a timeline
established by the OSD Cost Assessment and Program Evaluation (CAPE). How many days
prior to OIPT is required for the OSD CA, PMO and SCA to meet and compare and discuss
CCP and ICE.
10164688 1

45 days

28 days

None of these are correct

10 days

6) Purchases of end items, weapons and equipment greater than $250,000 intended for
operational use or inventory are funded from which appropriation?
10164700 1

Procurement

MILCON

RDT&E

O&M

7) In this course we base Symmetric Approximation around a five-step process. Step 1 of the
process focuses on selecting which of the following (select two):
10164676 6

High dollar cost elements

Element that are sensitive to changes made

Low dollar cost elements

Element which have a small range in potential value.

8) If we were purchasing a helicopter for operational use, funding half of the cost of the
helicopter in one year`s appropriation and funding the second half of the cost in the next year`s
appropriation would be an example of:
10164694 1

Información del documento

Subido en
18 de agosto de 2022
Número de páginas
10
Escrito en
2022/2023
Tipo
Examen
Contiene
Preguntas y respuestas
$12.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
registered_nurse
4.0
(132)
Vendido
656
Seguidores
586
Artículos
1536
Última venta
4 meses hace



Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes