100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4,6 TrustPilot
logo-home
Examen

Project Management Process, Technology and Practice, Vaidyanathan - Exam Preparation Test Bank (Downloadable Doc)

Puntuación
-
Vendido
-
Páginas
311
Grado
A+
Subido en
05-07-2022
Escrito en
2021/2022

Description: Test Bank for Project Management Process, Technology and Practice, Vaidyanathan prepares you efficiently for your upcoming exams. It contains practice test questions tailored for your textbook. Project Management Process, Technology and Practice, Vaidyanathan Test bank allow you to access quizzes and multiple choice questions written specifically for your course. The test bank will most likely cover the entire textbook. Thus, you will get exams for each chapter in the book. You can still take advatange of the test bank even though you are using newer or older edition of the book. Simply because the textbook content will not significantly change in ne editions. In fact, some test banks remain identical for all editions. Disclaimer: We take copyright seriously. While we do our best to adhere to all IP laws mistakes sometimes happen. Therefore, if you believe the document contains infringed material, please get in touch with us and provide your electronic signature. and upon verification the doc will be deleted.

Mostrar más Leer menos
Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Libro relacionado

Escuela, estudio y materia

Institución
Grado

Información del documento

Subido en
5 de julio de 2022
Número de páginas
311
Escrito en
2021/2022
Tipo
Examen
Contiene
Preguntas y respuestas

Temas

Vista previa del contenido

Project Management: Process, Technology, and Practice (Vaidyanathan)

Chapter 1 Projects and Project Management



1.1 True False



1) An example of a project is an accounting clerk entering journal entries.

Answer: FALSE

Diff: 2 Page Ref: 2



2) A project has a beginning and an end.

Answer: TRUE

Diff: 1 Page Ref: 2



3) Based on research cited in the textbook, 31 percent of software projects were canceled
before completion and cost an average of 189 percent of their original estimates in more
than half the projects.

Answer: TRUE

Diff: 3 Page Ref: 3



4) Complexity refers to the extent to which the items or elements upon which work is
performed or the work processes themselves are interrelated.

Answer: FALSE

Diff: 2 Page Ref: 6



5) Interdependence refers to the number of products or operations that are performed at
the same time and the resulting degree of difficulty.

Answer: FALSE

,Diff: 2 Page Ref: 6



6) Complexity in a project is directly attributed to the scope of the project.

Answer: TRUE

Diff: 1 Page Ref: 7



7) When developed, the DVD player was considered a Type C Level 1 project.

Answer: TRUE

Diff: 1 Page Ref: 8



8) A project is a set of activities to solve a problem or take advantage of an opportunity.

Answer: TRUE

Diff: 1 Page Ref: 8



9) Conceptualization is a process used to set the goals of a project, develop strategies to
support an organization's strategic goals, and outline tasks and schedules to accomplish
the project goals.

Answer: FALSE

Diff: 2 Page Ref: 9

,10) The pre-feasibility study is usually used to assess whether to conduct a full feasibility
study.

Answer: TRUE

Diff: 1 Page Ref: 9

11) A discovery audit is a controlled process for identifying potential problems and
opportunities.

Answer: FALSE

Diff: 2 Page Ref: 9



12) During the post-implementation phase, a project is brought to its proper completion.

Answer: FALSE

Diff: 2 Page Ref: 10



13) Quality functional deployment, Kano model, and affinity diagrams are tools used
during the design phase.

Answer: TRUE

Diff: 2 Page Ref: 11



14) A clear statement of project needs is an output associated with the planning phase.

Answer: FALSE

Diff: 2 Page Ref: 11



15) Risk management plans are an output associated with the analysis phase.

Answer: FALSE

Diff: 2 Page Ref: 11

, 16) User manuals are an output associated with the implementation phase.

Answer: TRUE

Diff: 2 Page Ref: 11



17) Project management and engineering and services of projects are the two main
streams of project activities.

Answer: TRUE

Diff: 2 Page Ref: 12



18) Final launch documents are an output associated with the closure phase.

Answer: TRUE

Diff: 2 Page Ref: 12



19) A benefit of project management is that it creates a structure and process that enables
a project to be kept under control.

Answer: TRUE

Diff: 2 Page Ref: 14
$40.99
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
tb4u City University New York
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
975
Miembro desde
3 año
Número de seguidores
776
Documentos
2371
Última venta
4 días hace

4.0

159 reseñas

5
88
4
27
3
19
2
6
1
19

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes