Project Management 2nd Edition by Pinto chapter 13 Test bank

Institución
Grado









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

Subido en
27 de octubre de 2015
Número de páginas
41
Escrito en
2014/2015
Tipo
Examen
Contiene
Preguntas y respuestas

Vista previa del contenido

Project Management, 2e (Pinto)
Chapter 13 Project Evaluation and Control

13.1 True/False

1) Gap analysis refers to any measurement process that first determines the goals and then the
degree to which the actual performance lives up to those goals.
Answer: FALSE
Diff: 2
Section: 13.1 Control Cycles - A General Model
Skill: Definition
AACSB Tag: Reflective

2) The classic S-curve is a plot of cumulative cost versus elapsed time in weeks.
Answer: TRUE
Diff: 1
Section: 13.2 Monitoring Project Performance
Skill: Definition
AACSB Tag: Reflective

3) Positive variance on an S-curve represents significant project progress.
Answer: FALSE
Diff: 2
Section: 13.2 Monitoring Project Performance
Skill: Definition
AACSB Tag: Reflective

4) It is possible to measure both positive and negative deviations from the schedule baseline with
the tracking Gantt chart.
Answer: TRUE
Diff: 2
Section: 13.2 Monitoring Project Performance
Skill: Definition
AACSB Tag: Reflective

5) The one factor that earned value management considers that an S-curve does not include is
performance.
Answer: TRUE
Diff: 2
Section: 13.3 Earned Value Management
Skill: Definition
AACSB Tag: Reflective




1
Copyright © 2010 Pearson Education, Inc.

, 6) The schedule performance index is the ratio of the actual cost to the earned value.
Answer: FALSE
Diff: 2
Section: 13.3 Earned Value Management
Skill: Definition
AACSB Tag: Reflective

7) The earned value of a project is the cumulative total costs incurred in accomplishing the
various work packages.
Answer: FALSE
Diff: 2
Section: 13.3 Earned Value Management
Skill: Definition
AACSB Tag: Reflective

8) Five weeks in the semester you have completed 0% of your project management class under
the 0/100 rule.
Answer: TRUE
Diff: 2
Section: 13.5 Issues in the Effective Use of Earned Value Management
Skill: Definition
AACSB Tag: Reflective

9) Your organization is in the midst of a project in uncharted waters; nothing you have attempted
before comes close to many of the activities that are necessary to bring this project to
completion. Your earned value management should probably be tracked closely with a
percentage complete rule in increments of 5 to 10 percent.
Answer: FALSE
Diff: 2
Section: 13.5 Issues in the Effective Use of Earned Value Management
Skill: Definition
AACSB Tag: Reflective

10) The project implementation profile assesses the performance of the project team with respect
to 10 critical success factors and can be used on an on-going project.
Answer: TRUE
Diff: 2
Section: 13.6 Human Factors in Project Evaluation and Control
Skill: Definition
AACSB Tag: Reflective




2
Copyright © 2010 Pearson Education, Inc.
$4.83
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Reseñas de compradores verificados

Se muestran los comentarios
8 año hace

5.0

1 reseñas

5
1
4
0
3
0
2
0
1
0
Reseñas confiables sobre Stuvia

Todas las reseñas las realizan usuarios reales de Stuvia después de compras verificadas.

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
smith2324 European Business School, London
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
94
Miembro desde
10 año
Número de seguidores
39
Documentos
196
Última venta
1 año hace

4.5

24 reseñas

5
13
4
9
3
2
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes