Project Management 2nd Edition by Pinto chapter 14 Test bank

Institución
Grado









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

Subido en
27 de octubre de 2015
Número de páginas
30
Escrito en
2014/2015
Tipo
Examen
Contiene
Preguntas y respuestas

Vista previa del contenido

Project Management, 2e (Pinto)
Chapter 14 Project Closeout and Termination

14.1 True/False

1) A project that is terminated by extinction is not completed successfully.
Answer: FALSE
Diff: 1
Section: 14.1 Types of Project Termination
Skill: Definition
AACSB Tag: Reflective

2) Termination by addition and termination by integration both represent successful project
completion.
Answer: TRUE
Diff: 2
Section: 14.1 Types of Project Termination
Skill: Definition
AACSB Tag: Reflective

3) The build, operate, transfer option for projects requires the project contractor to take initial
ownership of the project in order to make sure it works, thus mitigating risk in the short run.
Answer: FALSE
Diff: 2
Section: 14.2 Natural Termination - The Closeout Process
Skill: Factual
AACSB Tag: Reflective

4) Systematic errors are not one-time incidents, but instead represent built-in components of the
project management process.
Answer: TRUE
Diff: 2
Section: 14.2 Natural Termination - The Closeout Process
Skill: Definition
AACSB Tag: Reflective

5) The actual carryover from one project to another is minimal because projects are unique, one-
time events.
Answer: FALSE
Diff: 2
Section: 14.2 Natural Termination - The Closeout Process
Skill: Factual
AACSB Tag: Reflective




1
Copyright © 2010 Pearson Education, Inc.

, 6) Closeout activities are typically among the highest priority activities in a project.
Answer: FALSE
Diff: 2
Section: 14.2 Natural Termination - The Closeout Process
Skill: Factual
AACSB Tag: Reflective

7) Static factors that may play a role in the decision to terminate a project early include company
image and the presence of high sunk costs.
Answer: TRUE
Diff: 2
Section: 14.3 Early Termination for Projects
Skill: Factual
AACSB Tag: Reflective

8) A classic early warning sign of project failure is the realization that a product being developed
was targeting a market that few new products and firms were entering.
Answer: TRUE
Diff: 2
Section: 14.3 Early Termination for Projects
Skill: Factual
AACSB Tag: Reflective

9) Loss of team identify during project termination is a significant internal intellectual issue.
Answer: FALSE
Diff: 2
Section: 14.3 Early Termination for Projects
Skill: Factual
AACSB Tag: Reflective

10) Arbitration refers to the formalized system for dealing with grievances and administering
corrective justice to parties in a bargaining situation.
Answer: TRUE
Diff: 2
Section: 14.3 Early Termination for Projects
Skill: Definition
AACSB Tag: Reflective




2
Copyright © 2010 Pearson Education, Inc.
$4.22
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
smith2324 European Business School, London
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
94
Miembro desde
10 año
Número de seguidores
39
Documentos
196
Última venta
1 año hace

4.5

24 reseñas

5
13
4
9
3
2
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes