100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Examen

Project Management 2nd Edition by Pinto chapter 07

Puntuación
-
Vendido
2
Páginas
32
Subido en
27-10-2015
Escrito en
2014/2015

Project Management 2nd Edition by Pinto chapter 07 Test bank

Institución
Grado









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

Subido en
27 de octubre de 2015
Número de páginas
32
Escrito en
2014/2015
Tipo
Examen
Contiene
Preguntas y respuestas

Vista previa del contenido

Project Management, 2e (Pinto)
Chapter 7 Risk Management

7.1 True/False

1) The risk is highest in the earliest phase of the project life cycle.
Answer: TRUE
Diff: 1
Section: 7.0 Introduction
Skill: Factual
AACSB Tag: Reflective

2) As risk decreases in the project life cycle, opportunity increases.
Answer: FALSE
Diff: 1
Section: 7.0 Introduction
Skill: Factual
AACSB Tag: Reflective

3) Risks can be quantified by multiplying the likelihood a failure will occur by the severity of the
failure.
Answer: TRUE
Diff: 2
Section: 7.0 Introduction
Skill: Analytical
AACSB Tag: Analytic Skills

4) Technical risk is the probability that the project will not perform to the required standards or
produce substandard products or have excessive operating cost consumption.
Answer: TRUE
Diff: 2
Section: 7.1 Risk Management: A Four-Stage Process
Skill: Factual
AACSB Tag: Reflective

5) The probability that the investments made to fund the front-end activities will be lost due to
project abandonment is financing risk.
Answer: FALSE
Diff: 2
Section: 7.1 Risk Management: A Four-Stage Process
Skill: Definition
AACSB Tag: Reflective




1
Copyright © 2010 Pearson Education, Inc.

, 6) One approach to risk mitigation is simply to accept it.
Answer: TRUE
Diff: 2
Section: 7.1 Risk Management: A Four-Stage Process
Skill: Factual
AACSB Tag: Reflective

7) Risk cannot be transferred because ultimately your own project will suffer the consequences if
the event occurs.
Answer: FALSE
Diff: 2
Section: 7.1 Risk Management: A Four-Stage Process
Skill: Factual
AACSB Tag: Reflective

8) Contingency reserves require a construction company to hold back some funds in an account
just in case something happens that increases the overall project cost.
Answer: TRUE
Diff: 2
Section: 7.1 Risk Management: A Four-Stage Process
Skill: Factual
AACSB Tag: Reflective

9) The highest dollar value of reserves is typically task contingency.
Answer: FALSE
Diff: 2
Section: 7.1 Risk Management: A Four-Stage Process
Skill: Factual
AACSB Tag: Reflective

10) The PRAM model for risk management proposes that risk management follow a life cycle
much as projects follow a life cycle.
Answer: FALSE
Diff: 2
Section: 7.2 Project Risk Management: An Integrated Approach
Skill: Factual
AACSB Tag: Reflective

7.2 Fill in the Blank

1) __________ is defined as the art and science of identifying, analyzing, and responding to risk
factors throughout the life of a project and in the best interests of its objectives.
Answer: Risk management
Diff: 1
Section: 7.0 Introduction
Skill: Factual
AACSB Tag: Reflective

2
Copyright © 2010 Pearson Education, Inc.
$4.23
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada


Documento también disponible en un lote

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
smith2324 European Business School, London
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
94
Miembro desde
10 año
Número de seguidores
39
Documentos
196
Última venta
1 año hace

4.5

24 reseñas

5
13
4
9
3
2
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes