Escrito por estudiantes que aprobaron Inmediatamente disponible después del pago Leer en línea o como PDF ¿Documento equivocado? Cámbialo gratis 4,6 TrustPilot
logo-home
Document preview thumbnail
Vista previa 2 fuera de 9 páginas
Examen

BCF 130 Fundamentals of Cost Analysis Exam. (Answered)

Document preview thumbnail
Vista previa 2 fuera de 9 páginas

BCF 130 Fundamentals of Cost Analysis Exam. (Answered)Operating and Support Costs (O&S) (select two): Are part of the Life Cycle Costs used to operate, maintain and support a fielded system Include services associated with operating, modifying, maintaining, supplying, training, and supporting a system in the DoD inventory is required to be performed on cost-reimbursement contracts to determine the probable cost performance for each offer. Cost realism analysis During this step of the cost estimation process providing good directions and a clear trail to follow are essential in having an estimate that can be replicated. Documentation and Presentation At each Milestone Decision review, the DoD Component must fully fund the program to the CCP in the current Future Years Defense Program (FYDP) or commit to full funding of the cost position in the next FYDP upon certification by the Component Acquisition Executive and the DoD Component Chief Financial Officer. True Assumptions represent a common set of agreed on estimating standards that provide guidance and minimize conflicts in definitions. False Preparation of the Cost Analysis Requirements Description (CARD) is the responsibility of the Director of Cost Assessment and Program Evaluation (DCAPE) False The time to develop cost estimates can range from a few hours for rough estimates to years for building complete detailed "ground-up" cost estimates. True Which of the following should be considered when planning the formation of an estimate? Service life Expected operational use Source of funding streams A Cost Analysis Requirements Description (CARD) is required for all Acquisition Category (ACAT) programs. False consists of production, military construction, and deployment costs.

Vista previa del contenido

BCF 130 Fundamentals of Cost Analysis

Exam 1
Operating and Support Costs (O&S) (select two):

Are part of the Life Cycle Costs used to operate, maintain and support a fielded system

Include services associated with operating, modifying, maintaining, supplying, training, and supporting a system in the DoD
inventory

is required to be performed on cost-reimbursement contracts to determine the probable
cost performance for each offer.

Cost realism analysis

During this step of the cost estimation process providing good directions and a clear trail to follow are essential in having
an estimate that can be replicated.

Documentation and Presentation

At each Milestone Decision review, the DoD Component must fully fund the program to the CCP in the current Future Years
Defense Program (FYDP) or commit to full funding of the cost position in the next FYDP upon certification by the
Component Acquisition Executive and the DoD Component Chief Financial Officer.

True




Assumptions represent a common set of agreed on estimating standards that provide guidance and minimize conflicts in
definitions.

False

Preparation of the Cost Analysis Requirements Description (CARD) is the responsibility of the Director of Cost Assessment
and Program Evaluation (DCAPE)

False

The time to develop cost estimates can range from a few hours for rough estimates to years for building complete detailed
"ground-up" cost estimates.

True

Which of the following should be considered when planning the formation of an estimate?

Service life

Expected operational use

Source of funding streams

A Cost Analysis Requirements Description (CARD) is required for all Acquisition Category (ACAT) programs.

False

consists of production, military construction, and deployment costs.

, Investment

Which DoD policy document details the Milestone decision process, statutory and regulatory acquisition document
requirements, and acquisition management responsibilities?

DoD instruction 5000.02

Which of the following should be considered when planning the formation of an estimate?

Resources available to develop the estimate

Scope of Estimate

Timeline to develop the estimate

A follows a functional allocation of costs using categories which are then further stratified into sub-
categories.

Cost Element Structure

The OSD Director of Cost Assessment and Program Evaluation:

Is responsible for the independent cost estimate for ACAT II programs

A forms the basis of reporting structures used for reports placed on contract such as Cost and Software
Data Reporting (CSDR), Contract Performance Reports (CPR), and Contract Funds Status Reports (CFSR).

Cost Analysis Requirements Description (CARD)

Exam 2
You have collected the following cost data on 5 personnel shelters: $7800; $7750; $6999; $5850; and $4455. Based on this
information, you could say:

The median cost is $6999. Half the costs are above this value and half below.

define the requirements for the equipment being estimated, based on physical and
performance attributes, such as length, width, weight, horsepower, and size.

Technical performance measures

Inflation and Price Escalation tables for Navy, Army, Marine Corps, and DoD-wide appropriations can be generated using the:

Joint Inflation Calculator

The magnitude of each outlier can be calculated the by taking the difference between the observation and the mean and
dividing by the standard deviation.

True

What are examples of a Secondary data source (select two)?

Cost studies

Research papers

When grouping data in recurring and non-recurring costs, which of the following is not a non-recurring cost?

Engineering required for redesign, modifications, reliability, maintainability, and associated evaluation

is any cost that can be identified specifically with a particular final cost objective.

Direct costs

There are many Cost and Software Data Reporting (CSDR) formats. Which of the following is one of those formats?

Software Resource Data Reports (SRDRs)

[Image Description: Xbar = $48.25K, Summation of (Xi - Xbar)2 =545.50] Given the information provided:

You want to make a statement about the variability in the costs of personnel shelters. After collecting sample data (cost in $K)
on 9 shelters you perform some preliminary calculations.

Información del documento

Subido en
20 de marzo de 2022
Número de páginas
9
Escrito en
2022/2023
Tipo
Examen
Contiene
Preguntas y respuestas
$14.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
StudyConnect
3.5
(40)
Vendido
266
Seguidores
232
Artículos
1719
Última venta
3 meses hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes