100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Presentación

INF3708_ASSIGNMENT_02_2022_S2_correctSoftware Project Management

Puntuación
-
Vendido
-
Páginas
5
Subido en
31-01-2022
Escrito en
2021/2022

QUESTION 1 [30 Marks] QUESTION ON CHAPTER 5 1.1 Discuss the software efforts estimation techniques according to your prescribe textbook by Hughes and Cotterell (2009). In addition, fine at least one journal article that discussed software project estimation techniques/project estimation techniques and summary the techniques discussed in the article. Please remember to include the title of the article your reviewed. (20) 1.2. COCOMO is a cost estimation model that was built around equation. Provide the equation and describe the variables in Boehm’s equation for calculating effort in the use of the COCOMO model. (3) 1.3. Three systems with the following estimated lines of code were identified. Using Boehm’s equation, calculations and identify which year each system will be completed. Which system can be completed in three years? N: B show all your calculations. (7) System Line of code System type A 17862 Semi-detached mode B 10762 Semi-detached mode C 22132 Organic mode Table 1 for Question 1: System details COCOM Constants for calculation are made available in table 5.4 of your textbook, page 121.

Mostrar más Leer menos
Institución
Grado









Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

Subido en
31 de enero de 2022
Número de páginas
5
Escrito en
2021/2022
Tipo
Presentación
Personaje
Desconocido

Temas

Vista previa del contenido

Software Project Management

INF3708
Assignment 02: Due date 20 September 2019 Compulsory

ASSIGNMENT 02 - SEMESTER 2

Total Mark: 133 Marks = 100%

Mark weight: 60%

ASSIGNMENT 02
Due date 20 September 2019
Study material Hughes & Cotterell: Chapters 5 - 9
Total marks 133 marks
If your assignment is late, please DO NOT PHONE OR E-MAIL asking for an extension but include a note in
your assignment stating the reason for the late submission and we will decide whether or not it will be
marked.




Instructions:

1. Download and complete this assignment and submit online in a .pdf format by performing the calculations.

2. The following unique number has to be assigned to the assignment:

UNIQUE NUMBER:
758039

3. Show all your working (calculations).




This study source was downloaded by 100000835818796 from CourseHero.com on 01-31-2022 09:27:36 GMT -06:00


https://www.coursehero.com/file/44887039/INF3708-ASSIGNMENT-02-2019-S2-correctpdf/

, Questions on Chapter 5 - 7



QUESTION 1 [30 Marks]

QUESTION ON CHAPTER 5

1.1 Discuss the software efforts estimation techniques according to your prescribe textbook by Hughes
and Cotterell (2009). In addition, fine at least one journal article that discussed software project estimation
techniques/project estimation techniques and summary the techniques discussed in the article. Please
remember to include the title of the article your reviewed.
(20)

1.2. COCOMO is a cost estimation model that was built around equation. Provide the equation and
describe the variables in Boehm’s equation for calculating effort in the use of the COCOMO model.
(3)

1.3. Three systems with the following estimated lines of code were identified. Using Boehm’s
equation, calculations and identify which year each system will be completed. Which system can be
completed in three years? N:B show all your calculations. (7)

System Line of code System type

A 17862 Semi-detached mode
B 10762 Semi-detached mode
C 22132 Organic mode
Table 1 for Question 1: System details

COCOM Constants for calculation are made available in table 5.4 of your textbook, page
121.



QUESTION 2 [24 Marks]

QUESTIONS ON CHAPTER 6


2.1 Consider the following list of tasks with dependencies and estimated durations reflected
in table 2 and draw a CPD network diagram activity-on-node diagram to illustrate the
interaction of the activities. Include the calculations of all the values on the nodes forward
pass (earliest date) and backward pass (latest date). Note: please use the notation
example in your textbook. (14)




Activity Duration Predecessor

A 4 day -
B 2 days A
C 3 days A
D 2 days C
E
This study source was downloaded by 100000835818796 from5 days
CourseHero.com on B09:27:36 GMT -06:00
01-31-2022
F 7 days E
https://www.coursehero.com/file/44887039/INF3708-ASSIGNMENT-02-2019-S2-correctpdf/
$9.82
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
Allanswers34
1.0
(1)

Conoce al vendedor

Seller avatar
Allanswers34 University of Bristol
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
3
Miembro desde
3 año
Número de seguidores
3
Documentos
50
Última venta
3 año hace

1.0

1 reseñas

5
0
4
0
3
0
2
0
1
1

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes