*** i GOT AN 8.5 WITH THIS SUMMARY** This is a comprhensive summary of all lectures for the year 2022

Institución
Grado











Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

Subido en
20 de enero de 2022
Número de páginas
36
Escrito en
2021/2022
Tipo
Notas de lectura
Profesor(es)
Martin land
Contiene
Todas las clases

Temas

Vista previa del contenido

lOMoAR cPSD| 233498




Lecture 1 Capacity & variability
Chapter 0: Foundations

Performance aspects: performance is what characterizes a supply chain.
• Cost
• Quality
• Speed
• Service – use dependability
• Variety – referred to as flexibility
Hopp: You want to produce at low cost, high quality and high speed and high variety.

Often dependability and flexibility (mixed/volume changes) are used instead of service and variety.
Example: OTIF: on-time-in-full (percentage of products delivered on time and completely).

Relationship between multiple performance aspects: Strategic trade-offs and efficient frontiers

Determining the frontier
A frontier could be determined based on company data (DEA), using linear programming.

• What? It shows each company’s positions relative to the frontier, on the frontier or distance
to the frontier (also for more than 2 Performance aspects).
• This enables benchmarking studies

Supply chain (HOPP): a goal-oriented network of processes
and stock points used to deliver goods and services.
• Can be seen at different levels (e.g. SC-network or
production network).



Stock points:
1. Decoupling (anticipation, cycle (Batching), safety stocks) to buffer against uncertainty.
2. Queuing (stock not built on purpose) can result because of
a. Congestion (waiting for capacity)
b. Assembly (waiting for other parts)
c. Transport (waiting for scheduled event)
d. Batching (waiting for similar events)

Decoupling: not yet decided in which production order the stocked item will be processed next.

Queuing this decision has already been made (I need it for a order, but cannot yet be processed).

Customer order decoupling point: stock point after which the customer order is known. Can be at
different stages in a process (e.g. make-to-order (stock at the start), make to stock (stock at the end)).

Book structure – 3 Level issues:
1. Station level (1 process + feeding stock): capacity, variability, batching
2. Line level (1 path): flow, buffering, control (push/pull)
3. Network level (multiple paths): inventory, risk/pooling, coordination

, lOMoAR cPSD| 233498




Notice:

1. One station may have multiple servers – not just 1 machine

2. Entities: it can be many things and they flow through a system (orders, products, patients)

Chapter 1: Capacity

Definitions:
• Throughput (TH): rate at which entities are processed by the system (e.g. 15 per
hour)
• Work in process (WIP): number of entities in system (e.g. jobs, orders, people,
hours).
• Cycle time (CT): time it takes an entity to go through the whole system (also
throughput time or lead time).
o Throughput is the rate and throughput time the time it takes to go through
the system

• Capacity: maximum average rate that can be realized within the system.

Capacity determinants: depends on whether it is for a station, line or network!
Station: capacity = base capacity – detractors
o Base capacity: rate of the process under ideal conditions (in practice we don’t have it)
o Detractors: anything that slows the output of the process

In practice diagnosis are done through OEE (overall equipment effectiveness), which looks more
detailed into the detractors.

Capacity of Line or network: capacity is determined by the bottleneck which is the
process that constrains the capacity of the system.
o Bottleneck: process with the highest utilization.
o Utilization: rate into the station / capacity of the station.

OEE: Overall equipment effectiveness

Green are the detractors slowing up the
whole process.



OEE:

What is the remaining valuable operating
time / loading time




What we can deduct from this comparison is:

• What is the valuable percentage of operating time compared to the loading time

, lOMoAR cPSD| 233498




Capacity Principles:
1. Capacity: the output of a system cannot equal or exceed its capacity due to variability!
2. Utilization: cycle time increases with utilization and infinite cycle times will occur when
utilization approaches 100%.
3. Littler’s law: Over the long term avg WIP, Throughput rate and cycle time for any stable process
relate as: WIP = TH *CT


Utilization problems in practice

Managers often try to load a system close
to 100%capacity.
Consequences:
• Cycle times get too long and WIP
too high.
• Overtime to reduce WIP.
• After WIP reduction, back to
normal capacity overtime
vicious cycle. 3.

Managers use overtime to lower the cycle
times but start pushing more work which increases CT again.

Little’s law: WIP = TH x CT

Red cure original situation: release 1 order per hour but that is too close to capacity which increases the
cycle time. Managers introduce overtime then (capacity) to reduce the cycle time.

Chapter 2: Variability
How to determine the curves?

Queuing: at a single station with no limit on the number of entities that can queue up, the waiting time
(WT) due to queuing is given by: WT = V x U x T (HOPP).
o V = variability factor
Squared coefficient of variation:
standard deviation / mean
o U = utilization factor

o T = average effective process time for entity at the station

, lOMoAR cPSD| 233498




Impact of utilization and variability on waiting time (WT):
• Variability increases waiting time
• Utilization increases waiting time
• High variability and high utilization = long waiting times.
• Low variability allows throughput to increase without
increasing waiting times.
• Decreasing variability can lead to lower waiting times under
the same utilization SO:
o Without lowering throughput

Queuing formula only holds for:
1. Stationary systems with all distributions known (there might be variability but stays the same
over time)
2. Priorities either handled on a first-come-first-serve basis or random

Still useful, since it can be seen what the impact is on waiting times, etc. Thus, often you cannot calculate
an exact, WT But it gives an impression of a particular factor’s impact.
Note: variability is not only a problem that causes long waiting times, but can be used as an advantage.



Article: Throughput diagrams

Throughput diagrams are an important instrument to diagnose flow problems.

Diagrams:
• Starting point with amount of entities.
• Anytime an entity goes in/out then it is noted.
• WIP: vertical difference between cumulative input and output
• Cycle time: horizontal difference between input and output (throughput time)
• Throughput rate: rate at which entities are processed by the system (e.g. customers per hour)

o Example: total customers / time in minutes = customer rate per minute Little’s law: WIP = TH x
CT
$8.60
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Pim31 Rijksuniversiteit Groningen
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
290
Miembro desde
4 año
Número de seguidores
213
Documentos
18
Última venta
3 meses hace

3.9

26 reseñas

5
7
4
13
3
4
2
1
1
1

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes