100% de satisfacción garantizada Inmediatamente disponible después del pago Tanto en línea como en PDF No estas atado a nada 4.2 TrustPilot
logo-home
Notas de lectura

Frustration of a Contract

Puntuación
-
Vendido
-
Páginas
4
Subido en
17-08-2021
Escrito en
2018/2019

Lecture notes including key cases, analysis and theories

Institución
Grado








Ups! No podemos cargar tu documento ahora. Inténtalo de nuevo o contacta con soporte.

Escuela, estudio y materia

Institución
Estudio
Grado

Información del documento

Subido en
17 de agosto de 2021
Número de páginas
4
Escrito en
2018/2019
Tipo
Notas de lectura
Profesor(es)
Nicky jackson
Contiene
Todas las clases

Temas

Vista previa del contenido

Topic 7- Frustration of Contracts
Lecture 1- 29/01/19
If an event occurs outside the control of either party (eg, a fire) that makes the contract
impossible, then the contract is frustrated. – exceptional circumstances- cant be an event
that occurs all the time- makes the law of frustration coherent
The law used to be very harsh and it didn’t matter if there was an external factor-
Paradine v Jane 1647
Frustration was introduced to stop this harshness
National Carriers Ltd v Panalpina Ltd (1981)
Definition come from the Davis Contractors Case 1936 (in handout)
Relationship between frustration and contract interpretation:
Force Majeure Clauses
Parties can include this clause- this allocates the risk of an external event- remedies may be
included in this clause or it could say the contract can be delayed, makes it more flexible
J Lauritzen AS v Wijsmuller BV (1990)
“This contract will be cancelled if…”
Structure to the Law of Frustration

 Grounds of Frustration
 Limits to the operation of frustration- is it a party’s fault?
 Effects of Frustration- what can they get back? Deposit?
Grounds of Frustration
Frustration by Illegality: The contract will be frustrated if the performance of the contract
turns out to be illegal
Metropolitan Water Board v Dick, Kerr and Co ltd (1918)
 6 year contract was made
 WW1 broke out and government said they had to use their resources for war
 If they didn’t, it would be illegal
 Therefore, the contract conditions were altered, contracted was held frustrated
Islamic Rep of Iran Shipping Lines v Steamship Ass. (2010)
 UK prohibited business with some Iranian companies, including the claimant
 Courts said that there was no frustration, only certain types of frustration were
banned.
$7.56
Accede al documento completo:

100% de satisfacción garantizada
Inmediatamente disponible después del pago
Tanto en línea como en PDF
No estas atado a nada

Conoce al vendedor
Seller avatar
annamutter

Documento también disponible en un lote

Conoce al vendedor

Seller avatar
annamutter University of Leicester
Seguir Necesitas iniciar sesión para seguir a otros usuarios o asignaturas
Vendido
4
Miembro desde
4 año
Número de seguidores
4
Documentos
15
Última venta
1 año hace

0.0

0 reseñas

5
0
4
0
3
0
2
0
1
0

Recientemente visto por ti

Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes