Questions With Verified 100% Correct
Answers
PM: Project manager
PO: Purchase order
PPP: Public-private partnership
QA: Quality assurance
QC: Quality control
RFI: Request for information
RFP: Request for proposal
RFQ: Request for qualifications
ROM: Rough order of magnitude
SWPPP: Storm water pollution prevention plans
WBS: Work breakdown structure
BIM: Building information model
CAD: Computer-aided design
CD: Construction document
CM: Construction manager
CSI: Construction Specification Institute
DB Design-build
DD: Design development
FOR: Field observation report
, GC: General contractor
GMP: Guaranteed maximum price
IPD: Integrated project delivery
LEED: Leadership in Energy and Environmental Design
What are the five primary sectors of the construction industry? residential, commercial,
heavy civil, industrial, and environmental construction.
What is the role of the owner on a construction project? develop the program for the building,
define the scope of the project, create the budget, and provide the funding for the project.
What does LEED stand for, and what is its purpose? Leadership in Energy and Environmental
Design. A rating system that evaluates a building's environmental performance over its life cycle.
What is lean construction, and from what industry does its concepts stem? Lean construction is a
philosophy that focuses on adding value with less work and the elimination of waste in the
building process. It stems from the manufacturing industry, particularly the Toyota Production
System.
Distinguish between construction management as a function and construction management as a
project delivery method. The construction management function is estimating, scheduling,
cost control, and contract administration in order to monitor, manage, and control the work of the
contract for which the contractor is obligated. Construction management as a project delivery
method is a contractual arrangement.
Identify at least three characteristics that make the construction project unique from other
industry sector projects. Each construction project is built as a one-of-a-kind structure or
facility. Every construction project is built on a different and unique building site. The building
process takes place outside. Much of the work is performed by the human hand.
Name the four primary project values to be managed, monitored, and controlled. time, cost,
quality, and safety.
Why is scope definition so important in the construction process? Scope describes the extent of
the work that is to be performed by the contractor.
What is meant by the term project delivery? Project delivery is the overall structural or
organizational framework used to put all the aspects of designing and building a construction
project together.
Identify the three primary project delivery methods and discuss how they differ contractually.
Design-bid-build, the owner has separate contracts with the designer and the contractor.