SECTION 1: PROJECT PLANNING & SCOPE MANAGEMENT (Questions 130)
1. Which of the following best defines the primary responsibility of a construction project manager?
A) Performing all manual labor onsite
B) Overseeing project planning, scheduling, and execution
C) Designing structural elements
D) Inspecting local building codes
Correct Answer: B
Rationale: The primary role of a construction project manager is to plan, schedule, and oversee the
execution of projects, ensuring they meet deadlines, budget, and quality standards.
2. What is the purpose of a project baseline in construction management?
A) To record labor attendance
B) To measure environmental compliance
C) To serve as the approved plan for scope, schedule, and cost against which project performance is
measured
D) To establish site safety protocols
Correct Answer: C
,Rationale: A project baseline provides a reference for monitoring and controlling project performance in
terms of scope, time, and cost. It is the approved plan against which all project progress is measured.
3. Which document defines the project scope, schedule, and budget in NYC municipal construction?
A) Blueprints
B) Permit application
C) Contract specifications
D) Work order
Correct Answer: C
Rationale: Contract specifications clearly outline project expectations, including scope, timeline, and
cost. They are the legally binding documents that define what is to be built and how. Blueprints show
design but not budget/schedule details.
4. What is a milestone in a project schedule?
A) The total project cost
B) A safety inspection
C) A significant event or achievement marking progress
D) A detailed task list
Correct Answer: C
,Rationale: A milestone is a significant event or achievement that marks progress in a project schedule.
Milestones are used to track major deliverables and project phases.
5. Which project delivery method gives the owner a single point of responsibility for both design and
construction?
A) DesignBidBuild
B) Construction Management at Risk
C) DesignBuild
D) Integrated Project Delivery
Correct Answer: C
Rationale: In DesignBuild, the owner contracts with a single entity responsible for both design and
construction, reducing risk and coordination issues. This provides a single point of accountability.
6. What is the primary purpose of a project charter in construction management?
A) To assign tasks to team members
B) To define project scope, objectives, and stakeholders
C) To schedule project meetings
D) To track project costs
Correct Answer: B
, Rationale: A project charter formally authorizes the project and defines the project scope, objectives,
stakeholders, and key deliverables. It serves as the foundation for all subsequent project planning.
7. Which of the following is typically prepared in the early stages of a project to assist in budgeting and
feasibility analysis?
A) Detailed estimate
B) Preliminary (conceptual) estimate
C) Bid estimate
D) Final cost report
Correct Answer: B
Rationale: Preliminary estimates provide an early approximation of project costs to assist in budgeting
and feasibility analysis. They are less detailed than final estimates but essential for early decisionmaking.
8. What is a submittal in construction project management?
A) A legal contract
B) A document, sample, or product submitted for review and approval
C) A financial statement
D) A safety inspection report
Correct Answer: B