CEPS Exam 1 UPDATED ACTUAL QUESTIONS AND CORRECT ANSWERS To succeed in the construction industry ... - CORRECT ANSWER Time Quality Safety Scope Function Relationship Contractor's Estimator - CORRECT ANSWER Cost a) Determine actual cost of project for bidding purposes. b) Familiar with company's detailed cost data of labor and material. c) Familiar with construction method to be used. d) Knowledge of materials suppliers and the corresponding discounts they offer. Engineer's Estimator - CORRECT ANSWER plumbing, electrical, etc. b) Familiar with specialty labor rate and materials of the company. c) Familiar with specialty installation methods. d) Knowledge of specialty contractor material and tools. a) Determine specialty cost, e.g. Ability to forecast cost required to complete Purpose of Estimating - CORRECT ANSWER project in accordance to plan and specifications. Ability to reasonably provide accurate direct cost for materials, labor, and equipment. Ability to develop a bid price by adding the direct cost to indirect cost (overhead, contingencies, and profit.) Ability to determine the probable real cost and the probable real time. Conceptual Estimate - CORRECT ANSWER owner would like to build No drawings/specs available Feasibility Study Using "some" unit of measurement e.g., Cost per bed in a hospital project About ± 20% - 30% of accuracy Preliminary Estimate - CORRECT ANSWER with overall dimensions 5%~40% of the drawings Typically prepared by the architect or Produced from the description of what the Produced from a preliminary set of drawings

Vista previa del contenido

CEPS Exam 1 UPDATED ACTUAL
QUESTIONS AND CORRECT ANSWERS
To succeed in the construction industry ... - CORRECT ANSWER Cost

Time

Quality

Safety

Scope

Function

Relationship



Contractor's Estimator - CORRECT ANSWER a) Determine actual cost of project

for bidding purposes.

b) Familiar with company's detailed

cost data of labor and material.

c) Familiar with construction

method to be used.

d) Knowledge of materials suppliers

and the corresponding discounts

they offer.



Engineer's Estimator - CORRECT ANSWER a) Determine specialty cost, e.g.

plumbing, electrical, etc.

b) Familiar with specialty labor rate

and materials of the company.

c) Familiar with specialty

installation methods.

d) Knowledge of specialty

contractor material and tools.

, Purpose of Estimating - CORRECT ANSWER Ability to forecast cost required to complete
project in accordance to plan

and specifications.



Ability to reasonably provide accurate direct cost for materials, labor, and

equipment.



Ability to develop a bid price by adding the direct cost to indirect cost

(overhead, contingencies, and profit.)



Ability to determine the probable real cost and the probable real time.



Conceptual Estimate - CORRECT ANSWER Produced from the description of what the

owner would like to build



No drawings/specs available



Feasibility Study



Using "some" unit of measurement

➢e.g., Cost per bed in a hospital project



About ± 20% - 30% of accuracy



Preliminary Estimate - CORRECT ANSWER Produced from a preliminary set of drawings

with overall dimensions



5%~40% of the drawings



Typically prepared by the architect or

architect/engineer to reflect expected cost, and

Información del documento

Subido en
1 de agosto de 2026
Número de páginas
7
Escrito en
2026/2027
Tipo
Examen
Contiene
Preguntas y respuestas
$11.99

¿Documento equivocado? Cámbialo gratis Dentro de los 14 días posteriores a la compra y antes de descargarlo, puedes elegir otro documento. Puedes gastar el importe de nuevo.
Escrito por estudiantes que aprobaron
Inmediatamente disponible después del pago
Leer en línea o como PDF

Seller avatar
Los indicadores de reputación están sujetos a la cantidad de artículos vendidos por una tarifa y las reseñas que ha recibido por esos documentos. Hay tres niveles: Bronce, Plata y Oro. Cuanto mayor reputación, más podrás confiar en la calidad del trabajo del vendedor.
Vendido
62
Seguidores
2
Artículos
8582
Última venta
1 semana hace


Por qué los estudiantes eligen Stuvia

Creado por compañeros estudiantes, verificado por reseñas

Calidad en la que puedes confiar: escrito por estudiantes que aprobaron y evaluado por otros que han usado estos resúmenes.

¿No estás satisfecho? Elige otro documento

¡No te preocupes! Puedes elegir directamente otro documento que se ajuste mejor a lo que buscas.

Paga como quieras, empieza a estudiar al instante

Sin suscripción, sin compromisos. Paga como estés acostumbrado con tarjeta de crédito y descarga tu documento PDF inmediatamente.

Student with book image

“Comprado, descargado y aprobado. Así de fácil puede ser.”

Alisha Student

Preguntas frecuentes